title: "How to read a Wind Power company | eqdoc"
description: "eqdoc's guide to the Wind Power sector: what drives its results and the figures to check in a filing."
url: "https://eqdoc.com/guide/wind-power"
---

# How to read a Wind Power company

eqdoc's guide to the Wind Power sector: what drives its results and the figures to check in a filing.

## Business model
A wind power plant installs towers with turbines (blades, shaft, generator) that convert wind into electricity, which is fed to the grid via a transmission line and sold to an off-taker under a long-term power purchase agreement (PPA). Revenue = units generated × tariff. Once built, the plant is nearly fuel-free and highly automated (turbines start/stop automatically with wind speed), so operating & maintenance (O&M) costs are only ~15–20% of revenue and operating margins are very high (EBITDA margins of 50–85% cited for renewables). The economics are dominated not by operations but by three things fixed largely at construction: **where** the plant is (wind resource), **how it is funded** (heavy project debt), and **who buys the power and at what price for how long** (the PPA and the off-taker's ability/willingness to pay). Turbine technology is mature and asset lives run up to ~30 years, but generation is seasonal and variable while debt service is constant — so the whole business is a bet on stable cash flow meeting a fixed debt schedule.

## First question: which model / off-take arrangement?
The risk profile is set almost entirely by the off-take contract, so establish it before anything else:

| | Long-term fixed-price PPA (central agency) | Long-term PPA with state discom | Short-term / open access / REC / merchant |
|---|---|---|---|
| Off-taker | SECI / NTPC / NVVN (central nodal agency) | State distribution company | C&I customers, power exchange, REC market |
| Tenor | 20–25 years (aligned to plant life) | 20–25 years | 3–15 years or spot |
| Price & demand | Both fixed → **low market risk** | Fixed price but weak payer | Price and/or demand float → **high market risk** |
| Payment | Adequate security, tripartite mechanism | Delayed-payment track record; weak discom finances | Market-dependent, REC price volatile |
| Rating view | Viewed most favourably | Constrains rating | Highest cyclicality / repricing risk |

Also segment by **site (wind resource) and location**: PLF depends entirely on the wind regime; plants inside government renewable-energy parks (ready land, clearances, grid connectivity) carry far lower execution risk than greenfield sites outside; offshore plants cost ~2× onshore, have lower availability and higher degradation.

## Key success factors
1. **Large land requirements → land acquisition is the critical execution risk.** Wind is land-hungry (up to ~200× the land of a gas thermal plant for similar output) because of low PLF (~25–30% vs >85% for conventional) and mandatory spacing between turbines (wake turbulence; turbines 200–800 m apart, farms spanning 20–30 km). Land acquisition and approvals take the most time in the build schedule and have repeatedly delayed Indian projects. Government wind parks (plug-and-play land + approvals) and the environmental/forest clearance exemption materially lower this risk; plants inside parks are lower-risk than those outside.
2. **Low construction and execution risk (mature technology).** The turbine is established technology (more so than solar); design/construction risks are considered negligible with a proven track record of timely execution. The two real build risks are (a) land acquisition and (b) power-evacuation/transmission-line availability — India's transmission build-out lags wind capacity addition, so a plant can be ready but unable to sell. Advise budgeting ~30% cost overrun and ~6-month delay; offshore construction risk is higher.
3. **Long-term PPA & tariff — the revenue foundation, and a repricing trap.** A fixed-price, long-term PPA gives assured price and offtake and low market risk. But reverse-auction wind tariffs have fallen below conventional power, so **older plants sitting on high legacy PPA tariffs face renegotiation pressure** — discoms attempt to renegotiate or exit PPAs, especially when the contracted price is far above the current market rate. A high current tariff is not a durable advantage; it raises repricing/renewal risk. Short-tenor PPAs face renewal risk when they expire at lower prevailing prices.
4. **Off-taker / DISCOM counterparty quality & payment delays.** Most state discoms are financially weak and have a delayed-payment track record, which typically constrains a project's rating. Weak RPO compliance by obligated entities depresses demand despite the mandate. PPAs with central nodal agencies (SECI/NTPC) are viewed more favourably than those with state discoms or C&I customers because of better payment-security mechanisms. Payment delays force the plant to carry extra liquidity, depressing returns.
5. **Plant load factor & wind-resource variability (more seasonal than solar).** Generation is highly seasonal — the peak wind season is only 3–5 months and delivers ~two-thirds of annual output; the lean season runs much lower. Inter-annual variability is ~4–6% (std dev) at a P50 PLF of 25–30%. Wind has more moving parts than solar, so proper O&M is critical; if the plant fails during the short peak season it can wreck a whole year's generation. Plants also historically **underperform** base-case production forecasts and degrade ~2–3% per year (higher offshore).
6. **Capital intensity & high project debt.** Building meaningful capacity is expensive (~₹6.8–7.2 cr/MW onshore in India; offshore ~2×) and is an entry barrier for large capacity; below that, the sector is fragmented (single-turbine players). Projects are typically financed at ~75:25 debt:equity (3:1). **Debt tenor must match the cash-flow / asset life:** long tenors (15–20 years, up to 17–18) largely eliminate refinancing risk; short tenors (3/5/7/10 years) expose the plant to refinancing risk because the plant may not throw off enough cash to repay early.
7. **Liquidity buffers, O&M quality & cost of capital.** Seasonal generation vs constant (monthly/quarterly) debt repayment creates a cash-flow mismatch, requiring a debt-service reserve (DSRA, typically 1–2 quarters, sometimes 3–6 months) and a major-maintenance reserve (MMR). Developers chasing higher returns may under-fund these reserves or hire cheap/weak O&M contractors — both raise risk (rating agencies penalise inadequate MMR and under-priced O&M, which may force costlier operator replacement later). Very low O&M expense can be a warning sign, not efficiency.
8. **Diversification (geography + counterparty).** Plants exposed to natural events (storms, floods) and to single-off-taker non-performance. Geographically dispersed farms have lower correlation in wind patterns and natural-disaster exposure; multiple counterparties reduce the risk of simultaneous payment defaults. Diversification is the main mitigant for both weather and payment risk.
9. **Market risk & cyclicity (absent a fixed-price PPA).** Plants with fixed-price long-term PPAs + RPO offtake face little market risk. Plants without them — variable-price/formula PPAs, REC-route, open-access or merchant — face demand and price volatility tied to the economic cycle; project developers generally face high cyclical exposure.
10. **Social & regulatory risk (incl. curtailment & scheduling penalties).** Large land acquisition creates social friction (compensation disputes, protests). Regulatory levers — RPO enforcement, PPA renegotiation, land rules, open-access/REC terms — swing plant economics. Forecasting-and-scheduling regulations penalise deviation between actual and forecast generation, which is hard for inherently variable wind. Grid curtailment (off-taker not drawing power despite readiness) and inadequate sub-station capacity cause suboptimal utilisation.

## Metrics — what we CAN compute
| Metric | How | What "good" looks like |
|---|---|---|
| Operating margin (OPM) | existing view | Should be high — plant is fuel-free, O&M only ~15–20% of revenue; renewables run 50–85% EBITDA margin. Persistently low OPM = weak PLF, high curtailment, or tariff pressure |
| Leverage (D/E) | borrowings / (equity+reserves) | High by design (~75:25 → D/E ~3); watch whether it is trending down as debt amortises. Very high + rising is dangerous |
| Interest coverage (DSCR proxy) | (pbt+interest) / interest | Comfortable and stable through seasons/years; thin cover = vulnerable to generation shortfalls and payment delays. True DSCR (incl. principal) is not directly available |
| ROCE / ROE | existing views | Adequate through-cycle returns; high leverage flatters ROE, so read alongside D/E and interest cover |
| CFO stability | cfo trend vs net_profit | CFO should be positive and reasonably stable; lumpy/declining CFO signals payment delays or generation underperformance |
| FCF after debt service | cfo − capex (net_block/CWIP, cfi) − interest | Watch ability to self-fund debt repayment; chronic negative FCF while debt matures = refinancing pressure |
| Receivable days | 365 × avg receivables / sales | Stable/low; rising = DISCOM payment delays building up |
| Depreciation intensity | depreciation / sales (or /gross block) | Structurally high (capital-heavy asset); means reported PAT understates cash generation — read CFO, not just net profit |
| Cash & investments buffer | cash + investments vs near-term borrowings | Should reflect DSRA/MMR liquidity buffers given seasonal cash flows |
| Other income share | other_income / pbt | Low reliance; high share can flag treasury income masking weak core generation economics |

## Metrics we CANNOT get from financials (need annual reports / investor presentations — qualitative)
- **Plant load factor (PLF/CUF)** and actual-vs-forecast generation — the single most important operating metric; not in financials.
- **Wind-resource / site quality** (P50/P90 estimates, inter-annual variability, which sites, onshore vs offshore) — determines output.
- **PPA tariff, tenor and structure** (fixed vs variable/formula, expiry dates) — and whether tariff is above current market rate (repricing risk).
- **Off-taker mix and credit quality** (central agency vs state discom vs C&I vs REC/merchant) — the core counterparty risk.
- **DISCOM receivable ageing** — how long payments are actually delayed (financials give days, not payer-level ageing or which discoms).
- **Installed / operational capacity (MW)**, capacity under construction, and geographic diversification of the fleet.
- **Debt tenor and amortisation profile vs asset life** (refinancing risk), and adequacy of DSRA/MMR reserves.
- **O&M contractor quality**, evacuation/transmission availability, curtailment levels, and land-acquisition / social-conflict status.

## Red flags
- **Over-leverage combined with DISCOM payment delays** — high D/E project debt plus a weak state-discom off-taker with a delayed-payment record is the classic failure mode: constant debt service meets erratic collections. Emphasise this pairing.
- **Generation variability vs fixed debt service** — seasonal output (two-thirds in a 3–5 month window) and year-to-year wind variability against evenly-spread monthly/quarterly repayments; thin DSCR/interest cover and inadequate DSRA/MMR liquidity make a single bad wind season or peak-season outage a solvency event. Emphasise this mismatch.
- Legacy high-tariff PPA far above current market price → discom renegotiation/exit risk (repricing).
- Short debt tenor (3/5/7/10 yrs) not matched to asset life → refinancing risk.
- Suspiciously low O&M expense (cheap/weak contractor) or under-funded maintenance reserves.
- No long-term fixed-price PPA (merchant/REC/open-access/short-tenor) → market, price and renewal risk.
- Single off-taker or single geography (no diversification) → weather and simultaneous-payment-default exposure.
- Rising receivable days, weak/lumpy CFO despite high reported OPM (payment delays or curtailment), or low reported PLF-implied utilisation.
- Grid-curtailment / evacuation constraints, and RPO non-compliance depressing offtake.

## One-line screen intent
A strong wind power plant = a **well-sited, diversified** producer earning **high, stable operating margins** on a **long-term fixed-price PPA with a creditworthy off-taker (ideally a central agency)**, funded with **long-tenor debt matched to asset life and adequate DSRA/MMR liquidity**, so that seasonal, variable generation still comfortably covers a heavy but well-structured debt schedule — with the decisive variables (PLF, wind resource, PPA tariff/tenor, off-taker credit and receivable ageing) verified from annual reports, not the financial statements alone.

## Audit addenda (2026-07-19)
- **3-4x capacity multiple:** because wind PLF is ~25-30% vs >85% for conventional plants, up to 3-4x more wind MW is needed to replace every MW of conventional capacity — this multiple, not just turbine spacing, drives the land requirement.
- **Equipment warranties are weak vs solar:** wind turbine warranties typically run only ~2 years (defects in workmanship and installation; longer offered on new-generation turbines), versus solar panel performance warranties extending up to 20 years; teething issues concentrate in the first two years.
- **Offshore O&M is near double onshore** (USD 30-55/MWh vs USD 15-25/MWh onshore), on top of ~2x capex; offshore plants must also keep backup transformers/equipment on site because mid-sea repairs are slow — redundancy is crucial and inflates cost further.
- **Degradation nuance:** the 2-3% turbine performance adjustment (plus icing 0.5-1% and blade degradation 0.5-1%) are annual levelized adjustments, not cumulative reductions that grow over time — the playbook's "degrade ~2-3% per year" could be misread as compounding.

## How the live EqScore scorer measures this sector (2026-09-16)

**Framework.** `standard` — the guide sets no `framework` key, so `score_company` runs it against
`STANDARD_DEFAULTS`. The standard card judges an operating business on margins, returns, cash,
leverage, working capital and size; there are no book-return or float checks, and the
promoter-pledge level applies (only banks and insurers are exempt).

**Shared mechanics.** Every numeric check is graded by `grade()`: full weight at the full band or
better, zero at the half band or worse, linear in between, hard clamp above full — and where a
config leaves `full == half` the check degenerates to a hard step. Verdicts (pass/half/fail) come
from the raw band comparison. The score is points earned ÷ points **attempted** × 100, rounded with
Python's `round()` (half to **even**: 72.5 → 72). An `na` check leaves **both** sides of that ratio —
a company is not punished for a figure nobody published. `MIN_COVERAGE = 0.70`: below 70% of the
checklist's weight no score is published, only `insufficient_data`. No market value on record → no
score. Below `EXCELLENT_MCAP_FLOOR = 500` crore a score of `EXCELLENT_FLOOR = 80` or more is held
down to 79. The filing overlay (fixed penalty table, decay by half-life, clamped to −20…+100) and
the promoter-pledge level sit on top of the financial core.

**The coverage pull-down cannot run on this cohort.** Incomplete checklists are normally blended one
way only, toward the median of full-coverage peers, never upward — but `apply_coverage_pulldown`
returns immediately unless **at least three** companies in the sector have full coverage and a
published score. With three companies on the entire card, that gate will rarely be met, so in
practice this sector's scores are the raw points-earned-over-attempted figures with no sector
anchoring at all. Stated here because it is a real difference in how this card behaves, not a
technicality.

**Who is on this card.** Three companies carry the vendor label `Wind Power`: Orient Green Power
(`GREENPOWER`), Indowind Energy and Karma Energy. No alias in `eqscore_sector_aliases.json` maps any
other vendor label onto this slug, so the cohort is exactly three. All three companies named in the
retired playbook's scorer note are still on the card.

**Sector-specific configuration.** `resolve_cfg` layers framework defaults ← sector `scoring`. The
guide declares **no `subsections` key at all**, so there is one set of bands, and no `match` rule or
symbol pin exists to verify. This config sets margins, returns, graded debt and interest cover,
debtor days (full band only), raw-material share, size, the steadiness ceiling and cash conversion,
and arms `fcf_relief`. The total-outside-liabilities, wage-drift, growth, asset-turnover, inventory
and margin-squeeze checks are all off. Other income is left at the engine default. No weight
overrides. Total points attempted at full coverage: **110**.

| Check label | Metric | Full credit | Zero credit at/beyond | Weight |
|---|---|---|---|---|
| Healthy profit margins | Avg operating margin, % | ≥ 50 | 30 | 20 |
| Steady margins | OPM std-dev ≤ 15pp and no collapse (last year < avg − 8pp) | boolean | — | 10 |
| Good return on capital | Avg ROCE, % | ≥ 7 | 2 | 15 |
| Generates real cash | 5y FCF sum > 0, with the `fcf_relief` half-credit | boolean | — | 10 |
| Low debt | Weaker of the D/E and interest-cover fractions | D/E ≤ 1.5, cover ≥ 2.0 | D/E ≥ 2.5, cover ≤ 1.3 | 10 |
| Gets paid on time | Debtor days | ≤ 90 | 180 | 10 |
| Doesn't just resell inputs | Raw-material cost % of sales | ≤ 10 | 25 | 10 |
| Profits come from the business | Other income % of PBT | ≤ 20 | 30 | 5 |
| No boom-and-bust | No collapsed revenue spike | boolean | — | 5 |
| Real cash behind profits | 5y CFO as % of 5y PAT | ≥ 100 | 60 | 10 |
| Meaningful size | Latest annual sales, Rs cr (log scale) | ≥ 500 | 150 | 5 |

**The leverage bands contradict the business this guide describes.** This is the clearest problem on
the card and it deserves to be stated plainly. The guide says wind projects are "typically financed
at ~75:25 debt:equity (3:1)" and that high leverage is "high by design"; the D/E bands are
**1.5 / 2.5**, meaning a plant financed exactly as the guide says the sector finances itself scores
**zero** on the D/E leg of "Low debt" — and because the check takes the **weaker** of the D/E and
interest-cover fractions, a strong interest cover cannot rescue it. The companion solar card, whose
guide describes the *same* 75:25 structure, sets 3.0 / 4.0 instead, so the two cards disagree about
the same capital structure. The JSON offers **no stated reason** for the 1.5 / 2.5 choice and we are
not inventing one. Flagged for review.

**The FCF relief, and why it is narrow here.** `fcf_relief: true` grants **half** credit instead of a
fail on negative five-year FCF, but only when interest cover ≥ 1.5x **and** D/E is between 0 and 2.0
— both hardcoded in `score_company`, neither sector-tunable (the `0 <=` leg exists because negative
net worth makes D/E negative, and "−5.0 ≤ 2.0" would otherwise pass). On this card the relief
condition is *looser* than the "Low debt" full band but stricter than its zero band, so a
normally-levered wind IPP can qualify for FCF relief while still scoring zero on leverage.

**Bands that follow the guide, and bands with no stated reason.** This JSON carries **no `why` field
at any level**, so the reasoning below is ours, drawn from the business analysis above, and marked as
such.

- The steadiness ceiling at **15pp**, against the engine's default of 4pp, is the band that most
  clearly tracks the guide: a business whose peak season delivers two-thirds of annual output in a
  3–5 month window, with 4–6% inter-annual resource variability, should not have that swing scored
  as instability. (Reasoning.)
- Returns at **7/2** are the lowest ROCE bars of these three power cards and sit far below the
  engine default of 15/10, consistent with a PPA-capped annuity whose return was fixed at financial
  close. (Reasoning.)
- Raw material at **10/25** is the tightest resale band of the three, which is coherent for a
  fuel-free plant that buys essentially no inputs — O&M at 15–20% of revenue is not raw material.
  (Reasoning.)
- Margins at **50/30**, debtor days at **90/180**, cash conversion at **100/60** and size at
  **500/150** have **no rationale we can source** — neither in the JSON, which has no `why`, nor in
  the retired playbook's scorer note, which mentioned only margins-as-fixed-charge-recovery, the
  7/2 returns, the 15pp ceiling and the FCF relief. The margin band is notably the loosest of these
  three cards' full bars relative to the 50–85% EBITDA range the guide names: 50% is the bottom of
  that range, not its middle. We record that without asserting why it was chosen.
- Note also that only `dd_full` is sector-set: `dd_half` at 180 is the engine's own default, so the
  zero-credit bar on debtor days is inherited rather than chosen for wind.

**A caution on calibration.** With three companies, no band on this card can have been calibrated on
a measured distribution, and this document does not claim any was. Three observations have no
percentiles worth quoting — a single company's figure *is* the quantile. Read every band above as a
stated judgement about the business model, and treat cross-company comparisons on this card as
anecdote rather than distribution.

**Segment signal.** From `seg_hi`/`seg_mid` against average OPM: ≥ 50% "Strong pricing power",
≥ 30% "Moderate pricing power", otherwise "Low pricing power". These are the engine's **default**
labels — the guide does not override them — and they misdescribe the business. A wind IPP's margin is
fixed-charge recovery under a PPA signed years earlier, and the guide's own finding is that price and
demand are *fixed by contract*; a high label indicates contracted economics, not power over price.

**Version.** `method_version` is `"m" + SCORER_REV + "." + sha256(payload)[:8]` — currently
`m2.<8 hex>` (`SCORER_REV = "2"`). The payload covers the penalty and half-life tables, every
framework's defaults, **every sector's `scoring` block and subsection overrides**, the aliases, the
coverage and top-tier gates, the pledge ramp and the overlay clamp — so editing any band above
changes the published method version.

# EqScore checks

The checks eqdoc scores a company in this sector on (its [EqScore](https://eqdoc.com/guide/wind-power)), in the order of the card.

| Factor | The question | Good | Red flag |
|---|---|---|---|
| Operating margin / cost structure | Is the operating margin high, as expected for a fuel-free, low-O&M plant? | high and stable OPM (O&M only ~15-20% of revenue) | persistently low/declining OPM signals weak PLF, curtailment or tariff pressure |
| Leverage / project debt | Is leverage, though structurally high (~75:25), amortising rather than rising uncontrollably? | high by design but trending down as debt repays | very high and rising D/E in a seasonal cash-flow business |
| Debt-service capacity (DSCR proxy) | Does interest coverage stay comfortable through seasonal and inter-annual generation swings? | comfortable, stable cover | thin cover; true DSCR incl. principal not in financials; variable generation vs constant debt service |
| Cash flow stability / earnings quality | Is CFO positive and stable, tracking high reported margins (given heavy depreciation)? | stable positive CFO; PAT understated by high depreciation | lumpy/weak CFO despite high OPM = payment delays or generation underperformance |
| DISCOM payment delays | Are receivable days low/stable rather than building up? | low, stable receivable days | rising receivables = weak state-discom off-taker delaying payments |
| Through-cycle returns | Are ROCE/ROE adequate, read alongside high leverage? | adequate returns; ROE not merely a leverage artefact | weak ROCE, or high ROE driven only by 3:1 debt |
| Plant load factor / generation | What is actual PLF/CUF vs forecast (peak season = ~two-thirds of output)? | PLF near P50 (25-30%), actual meets base-case forecast | underperformance vs forecast; not visible in financial statements |
| PPA tariff & tenor / repricing risk | Is the PPA fixed-price and long-term, and is the tariff near (not far above) current market rate? | long-term fixed-price PPA at market-aligned tariff | legacy tariff far above market = discom renegotiation/exit; short-tenor PPA = renewal risk |
| Off-taker credit quality | Who is the off-taker (central agency vs state discom vs C&I/REC/merchant)? | central nodal agency (SECI/NTPC) with payment-security mechanism | weak state discom or merchant/REC offtake with no assured demand/price |
| Debt tenor vs asset life / liquidity buffers | Is debt tenor matched to asset life and are DSRA/MMR reserves adequate? | long tenor (15-20 yrs) matched to life; funded DSRA & MMR | short tenor (3/5/7/10 yrs) = refinancing risk; under-funded reserves or cheap/weak O&M |
| Diversification | Is the fleet diversified across geography and counterparties? | dispersed sites (low wind correlation) and multiple off-takers | single site/single off-taker = weather and simultaneous-default exposure |
| Regulatory / curtailment risk | Is the plant exposed to grid curtailment, RPO non-compliance, or scheduling penalties? | evacuation secured, RPO-backed offtake, low deviation penalties | curtailment/evacuation constraints, weak RPO enforcement, forecasting-deviation penalties |
| Land acquisition & evacuation for growth capacity | Is under-construction capacity inside government renewable-energy parks (ready land, clearances, grid connectivity) or greenfield, and is transmission connectivity tied up? | expansion inside govt wind parks or with land + evacuation already secured; budgeted ~30% cost overrun / 6-month delay cushion | greenfield sites with pending land acquisition or transmission connectivity — the two activities that most delay Indian wind projects; social/compensation disputes on land |
| Equipment warranty & turbine vintage | How old is the turbine fleet and what supplier warranty/support backs it (wind warranties run only ~2 years vs ~20 for solar)? | newer-generation turbines with longer warranties, reputable supplier, teething issues (first 2 years) behind them | ageing fleet past warranty with rising breakdown risk in the short peak season; performance deterioration ~2-3%/yr with weak supplier support |
| Onshore vs offshore mix | Does the fleet include offshore capacity, which carries ~2x capex, near-double O&M (USD 30-55/MWh vs 15-25), lower availability and higher degradation? | predominantly onshore fleet, or offshore priced/funded for its higher cost and redundancy needs | offshore exposure without matching liquidity/backup-equipment provisioning; higher construction risk mid-sea |
$1

- [All sector reading guides](https://eqdoc.com/guides)
- [All sectors](https://eqdoc.com/sectors)
- [How eqdoc verifies its figures](https://eqdoc.com/accuracy)
- [This guide in eqdoc's knowledge bundle (Open Knowledge Format), with its EqScore checks](https://eqdoc.com/okf/sectors/wind-power.md)

## Main sections

- [Home: ask the research desk](https://eqdoc.com/)
- [Stock screener](https://eqdoc.com/screener)
- [EqScore](https://eqdoc.com/eqscore)
- [Exchange filings](https://eqdoc.com/filings)
- [Results calendar](https://eqdoc.com/results-calendar)
- [Bulk and block deals](https://eqdoc.com/deals)
- [Stocks: the largest companies and A to Z](https://eqdoc.com/stocks)
- [Sectors](https://eqdoc.com/sectors)
- [Sector reading guides](https://eqdoc.com/guides)
- [Pricing](https://eqdoc.com/pricing)
- [Accuracy and verification](https://eqdoc.com/accuracy)
- [About eqdoc](https://eqdoc.com/about)
- [MCP server for AI tools](https://eqdoc.com/mcp)
- [Contact](https://eqdoc.com/contact)