---
type: "Promise Ledger"
title: "Baroda Extrusion Ltd: what management promised, and what happened"
description: "14 statements by Baroda Extrusion Ltd's management, each checked against the company's later filings: 10 pending, 4 unverifiable."
resource: "https://eqdoc.com/stock/513502"
tags: ["promise ledger","management guidance","india","513502"]
sources: [{"resource":"https://eqdoc.com/pdf/ann/7454689.pdf"},{"resource":"https://eqdoc.com/pdf/ann/7192895.pdf"},{"resource":"https://eqdoc.com/pdf/ann/7164430.pdf"}]
generated: {"by":"process:eqdoc-promise-audit"}
x-eqdoc-symbol: "513502"
x-eqdoc-counts: {"kept":0,"slipped":0,"missed":0,"pending":10,"unverifiable":4}
---

# How to read this

Each entry is something management said it would do, when it said it, and whether the company's later filings show it happened.
- **Kept**: a later filing shows it done. **Slipped**: done late or in part. **Missed**: the deadline passed without it.
- **Pending**: the deadline has not come, or no later filing yet speaks to it. **Unverifiable**: no filing could settle it.
- Evidence is either a sentence built from figures the company filed, or a quote from a later company document, as marked.

# Promises

## 2026-10-29 · Poised for capacity addition beyond the current annual capacity of approximately 3,600 MT.: Pending

- Said: approximately 3,600 MT annual capacity and poised for capacity addition.
- By: Company presentation, Investor presentation, 29 Oct 2026
- Verdict: Pending
- Evidence: Not due yet, so it can't be checked.
- Filing: <https://eqdoc.com/pdf/ann/7454689.pdf> (page 5)

## 2026-10-29 · Utilize available industrial land parcel of ~11 lakh sq. ft. at Tulsipura for future manufacturing expansion.: Pending

- Said: Tulsipura Land Parcel ~11 Lakh Sq. Ft. Available industrial land for future manufacturing expansion
- By: Company presentation, Investor presentation, 29 Oct 2026
- Verdict: Pending
- Evidence: Not due yet, so it can't be checked.
- Filing: <https://eqdoc.com/pdf/ann/7454689.pdf> (page 8)

## 2026-10-29 · Utilize ~9 lakh sq. ft. land parcel at Dungarpura for future manufacturing expansion.: Pending

- Said: Dungarpura Land Parcel ~9 Lakh Sq. Ft. Available industrial land for future manufacturing expansion
- By: Company presentation, Investor presentation, 29 Oct 2026
- Verdict: Pending
- Evidence: Not due yet, so it can't be checked.
- Filing: <https://eqdoc.com/pdf/ann/7454689.pdf> (page 8)

## 2026-08-18 · Management aims to scale revenue up to ₹1,000 crores over a 3 to 5 year horizon.: Pending

- Said: So, going to 1,000 crores, we are very much aware that whatever points should we keep in mind that should not affect us or not make us down now in future.
- By: Alpesh Kanugo, Q1 FY27 earnings call
- Due: 3 to 5 years
- Verdict: Pending
- Evidence: Not due until 18 Aug 2031, after the latest results; later ones will show.
- Filing: <https://eqdoc.com/pdf/ann/7192895.pdf> (page 7)

## 2026-08-18 · Management expects minimum revenue growth of 35% to 40% compared to the previous year for FY27.: Pending

- Said: Minimum, minimum, I observe the rise of 35% to 40% minimum as per the last year, comparating to the last year.
- By: Alpesh Kanugo, Q1 FY27 earnings call
- Due: FY27 and 28
- Verdict: Pending
- Evidence: Not due until 31 Mar 2027, after the latest results; later ones will show.
- Filing: <https://eqdoc.com/pdf/ann/7192895.pdf> (page 5)

## 2026-08-18 · Manufacturing capacity is planned to exceed 500 tons per month or 6,000 tons per annum post-expansion.: Pending

- Said: We would be easily manufacturing about maybe it would be more than double 500 tons per, per month, so 6,000 tons per annum, because the capacity we are planning is more
- By: Alpesh Kanugo, Q1 FY27 earnings call
- Due: after the expansion
- Verdict: Pending
- Evidence: Not due yet, so it can't be checked.
- Filing: <https://eqdoc.com/pdf/ann/7192895.pdf> (page 6)

## 2026-08-18 · Operating margins are guided to remain consistent, fluctuating only within plus or minus 1% to 2%.: Pending

- Said: We are firm that it should vary by 1% or 2% plus minus, but it will continue, because we are in a very smooth working
- By: Alpesh Kanugo, Q1 FY27 earnings call
- Verdict: Pending
- Evidence: Not due yet, so it can't be checked.
- Filing: <https://eqdoc.com/pdf/ann/7192895.pdf> (page 7)

## 2026-08-18 · Planned capital expenditure for plant and machinery is estimated at ₹20 to ₹25 crore.: Unverifiable

- Said: CAPEX is the same measure told, 20-25 CR, including machines and, plant and machinery.
- By: Alpesh Kanugo, Q1 FY27 earnings call
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.
- Filing: <https://eqdoc.com/pdf/ann/7192895.pdf> (page 7)

## 2026-08-18 · The company expects an existing order book of ₹20 crore as of 31 July 2026 to convert into approved sales.: Unverifiable

- Said: We still have a 20 crore order as on 31st July 2026, expected to convert into approved sales.
- By: Vaishali Joshi, Q1 FY27 earnings call
- Due: 2026-07-31
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.
- Filing: <https://eqdoc.com/pdf/ann/7192895.pdf> (page 4)

## 2026-08-13 · Achieve revenues of approximately ₹1,000 crore within the next 3 to 5 years.: Pending

- Said: our vision is to achieve revenues of approximately ₹1000 crore within the next 3-5 years
- By: Company presentation, Investor presentation, 13 Aug 2026
- Due: within the next 3-5 years
- Verdict: Pending
- Evidence: Not due until 13 Aug 2031, after the latest results; later ones will show.
- Filing: <https://eqdoc.com/pdf/ann/7164430.pdf> (page 19)

## 2026-08-13 · Deploy planned capex of approximately ₹25-30 crore focused on plant and machinery.: Pending

- Said: Approx. ₹25-30 Cr planned capex focused on plant & machinery
- By: Company presentation, Investor presentation, 13 Aug 2026
- Verdict: Pending
- Evidence: Not due yet, so it can't be checked.
- Filing: <https://eqdoc.com/pdf/ann/7164430.pdf> (page 18)

## 2026-08-13 · Scale post-expansion capacity to 6,000 MT.: Pending

- Said: Post-expansion capacity targeted at 6,000 MT
- By: Company presentation, Investor presentation, 13 Aug 2026
- Verdict: Pending
- Evidence: Not due yet, so it can't be checked.
- Filing: <https://eqdoc.com/pdf/ann/7164430.pdf> (page 18)

## 2026-08-13 · Target a reduction in inventory days to enhance operational efficiency.: Unverifiable

- Said: Management is targeting a reduction in inventory days
- By: Company presentation, Investor presentation, 13 Aug 2026
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.
- Filing: <https://eqdoc.com/pdf/ann/7164430.pdf> (page 18)

## 2026-08-13 · Target execution of ₹20 crore unexecuted order book by end-August 2026.: Unverifiable

- Said: ₹20 Cr Unexecuted Order Book as of End-July 2026, with Execution Targeted by End-August 2026
- By: Company presentation, Investor presentation, 13 Aug 2026
- Due: End-August 2026
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.
- Filing: <https://eqdoc.com/pdf/ann/7164430.pdf> (page 18)

Live record: https://eqdoc.com/stock/513502. Not investment advice.
