title: "Shri Keshav Cements And Infra Ltd: what management promised, and what happened"
description: "17 statements by Shri Keshav Cements And Infra Ltd's management, each checked against the company's later filings: 2 slipped, 2 missed, 5 pending, 8 unverifiable."
resource: "https://eqdoc.com/stock/530977"
tags: ["promise ledger","management guidance","india","530977"]
sources: [{"resource":"https://www.bseindia.com/xml-data/corpfiling/AttachLive/4c9955de-95a8-4658-993b-f98dfb0739f3.pdf"},{"resource":"https://www.bseindia.com/xml-data/corpfiling/AttachLive/734cf62f-2afe-46c6-8991-a8cde6b699a1.pdf"},{"resource":"https://www.bseindia.com/xml-data/corpfiling/AttachLive/87b97aea-6eae-4666-a905-748e482c60ec.pdf"},{"resource":"https://www.bseindia.com/xml-data/corpfiling/AttachLive/27113215-a50b-4fda-97f6-b76ab9475e26.pdf"},{"resource":"https://www.bseindia.com/xml-data/corpfiling/AttachLive/d01dcc25-f3e8-4331-82d3-abc305f8e773.pdf"}]
generated: {"by":"process:eqdoc-promise-audit"}
x-eqdoc-symbol: "530977"
x-eqdoc-counts: {"kept":0,"slipped":2,"missed":2,"pending":5,"unverifiable":8}
---

# How to read this

Each entry is something management said it would do, when it said it, and whether the company's later filings show it happened.
- **Kept**: a later filing shows it done. **Slipped**: done late or in part. **Missed**: the deadline passed without it.
- **Pending**: the deadline has not come, or no later filing yet speaks to it. **Unverifiable**: no filing could settle it.
- Evidence is either a sentence built from figures the company filed, or a quote from a later company document, as marked.

# Promises

## 2026-02-16 · Clinker-to-cement conversion ratio is projected to reach around 1.9 to 2 tons within a quarter.: Unverifiable

- Said: So we are expecting to reach around 1.9 to 2, not in this quarter, maybe a quarter down the line from this point onwards.
- By: Venkatesh Katwa, Q3 FY26 earnings call
- Due: maybe a quarter down the line
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.
- Filing: <https://www.bseindia.com/xml-data/corpfiling/AttachLive/4c9955de-95a8-4658-993b-f98dfb0739f3.pdf> (page 4)

## 2026-02-16 · Debt repayment obligation in the next financial year will reduce by around 16.4%.: Pending

- Said: In fact, the repayment obligation next financial year will reduce by around 16.4%, owing to closure of 3 term loans in FY '26.
- By: Venkatesh Katwa, Q3 FY26 earnings call
- Due: next financial year
- Verdict: Pending
- Evidence: Not due yet, so it can't be checked.
- Filing: <https://www.bseindia.com/xml-data/corpfiling/AttachLive/4c9955de-95a8-4658-993b-f98dfb0739f3.pdf> (page 4)

## 2026-02-16 · FY27 debt repayment obligation is estimated at approximately INR 23 crores.: Pending

- Said: In FY '27, our debt obligation is about INR23 crores.
- By: Venkatesh Katwa, Q3 FY26 earnings call
- Due: FY '27
- Verdict: Pending
- Evidence: Not due until 31 Mar 2027, after the latest results; later ones will show.
- Filing: <https://www.bseindia.com/xml-data/corpfiling/AttachLive/4c9955de-95a8-4658-993b-f98dfb0739f3.pdf> (page 14)

## 2026-02-16 · Full-year EBITDA is targeted between INR 40 crores and INR 45 crores for FY26.: Unverifiable

- Said: So maybe this year, we'll sign off with INR40 crores to INR45 crores EBITDA, which is assuming around 30%, 31%, 32% capacity utilization.
- By: Venkatesh Katwa, Q3 FY26 earnings call
- Due: this year
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.
- Filing: <https://www.bseindia.com/xml-data/corpfiling/AttachLive/4c9955de-95a8-4658-993b-f98dfb0739f3.pdf> (page 11)

## 2026-02-16 · Internal power cost is projected to fall below INR 1 per unit by the end of FY27.: Pending

- Said: By end of FY '27, we expect our price of power to go down less than INR1, whereas we are selling at INR6.
- By: Venkatesh Katwa, Q3 FY26 earnings call
- Due: end of FY '27
- Verdict: Pending
- Evidence: Not due until 31 Mar 2027, after the latest results; later ones will show.
- Filing: <https://www.bseindia.com/xml-data/corpfiling/AttachLive/4c9955de-95a8-4658-993b-f98dfb0739f3.pdf> (page 8)

## 2026-02-16 · Plant capacity utilization is expected to sign off at around 40% for FY26.: Unverifiable

- Said: So we are expecting to sign off this year by around 40% utilization.
- By: Venkatesh Katwa, Q3 FY26 earnings call
- Due: this year
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.
- Filing: <https://www.bseindia.com/xml-data/corpfiling/AttachLive/4c9955de-95a8-4658-993b-f98dfb0739f3.pdf> (page 11)

## 2026-02-16 · Targeted capacity utilization for next financial year is around 45% to 55%.: Pending

- Said: Maybe next year, we are targeting around 45% to 55% capacity utilization in case the market still remains compressed or having challenges of overcapacity.
- By: Venkatesh Katwa, Q3 FY26 earnings call
- Due: next year
- Verdict: Pending
- Evidence: Not due yet, so it can't be checked.
- Filing: <https://www.bseindia.com/xml-data/corpfiling/AttachLive/4c9955de-95a8-4658-993b-f98dfb0739f3.pdf> (page 11)

## 2025-11-18 · Fuel consumption is targeted to fall below 800 kilocalories within a couple of months.: Unverifiable

- Said: So, we have to reach below 800 kilo calories, and we are reaching almost 850 to 900 kilo calories right now. So, it might take another couple of months
- By: Venkatesh Katwa, Q2 FY26 earnings call
- Due: another couple of months
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.
- Filing: <https://www.bseindia.com/xml-data/corpfiling/AttachLive/734cf62f-2afe-46c6-8991-a8cde6b699a1.pdf> (page 5)

## 2025-11-18 · Management expects power consumption per unit to reduce by an additional 5% to 6% in Q3 FY26.: Unverifiable

- Said: Power consumption per unit has reduced by almost 20%-25% and there is a scope for reduction of another 5%-6% which we will most likely achieve in this quarter.
- By: Venkatesh Katwa, Q2 FY26 earnings call
- Due: in this quarter
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.
- Filing: <https://www.bseindia.com/xml-data/corpfiling/AttachLive/734cf62f-2afe-46c6-8991-a8cde6b699a1.pdf> (page 8)

## 2025-11-18 · Setting up of RMC operations is tentatively planned by the end of Q4 FY26 or Q1 FY27.: Unverifiable

- Said: So, as of now, we are still looking at by end of Q4 region or Q1 of next year is a tentative time when we will work on setting up.
- By: Venkatesh Katwa, Q2 FY26 earnings call
- Due: by end of Q4 region or Q1 of next year
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.
- Filing: <https://www.bseindia.com/xml-data/corpfiling/AttachLive/734cf62f-2afe-46c6-8991-a8cde6b699a1.pdf> (page 12)

## 2025-08-15 · Deliver EBITDA between INR 55 crores and INR 60 crores in FY26.: Missed

- Said: So reasonably, we are expecting EBITDA of around INR55 crores to INR60 crores this year compared to what we had predicted around INR70 crores, INR75 crores earlier.
- By: Venkatesh Katwa, Q1 FY26 earnings call
- Due: this year
- Verdict: Missed
- Evidence: Standalone operating profit for FY26 came to ₹36 cr — short of the ₹55 cr promised, with the window closed.
- Filing: <https://www.bseindia.com/xml-data/corpfiling/AttachLive/87b97aea-6eae-4666-a905-748e482c60ec.pdf> (page 10)

## 2025-08-15 · Reach INR 100 crores EBITDA in FY27.: Pending

- Said: With 65% to 70% production levels, INR100 crores EBITDA is a very safe bet. Yes, we should be able to do that.
- By: Venkatesh Katwa, Q1 FY26 earnings call
- Due: FY '27
- Verdict: Pending
- Evidence: Not due until 31 Mar 2027, after the latest results; later ones will show.
- Filing: <https://www.bseindia.com/xml-data/corpfiling/AttachLive/87b97aea-6eae-4666-a905-748e482c60ec.pdf> (page 14)

## 2025-06-02 · Achieve 50% capacity utilization throughout FY26.: Slipped

- Said: So, we would be able to achieve the rated 50% utilization throughout for the FY ‘26 and we think we are already on the course of it as of now.
- By: Venkatesh Katwa, Q4 FY25 earnings call
- Due: FY ‘26
- Verdict: Slipped
- Evidence: The Q1 FY26 call, 15 Aug 2025 settles it: “So we are targeting around 45% this year and then slowly wrap it up to about 60% -- 55% to 60% next year and around 70% in the following year.”
- Filing: <https://www.bseindia.com/xml-data/corpfiling/AttachLive/27113215-a50b-4fda-97f6-b76ab9475e26.pdf> (page 5)

## 2025-06-02 · Achieve around Rs. 70 crores of EBITDA in FY26.: Missed

- Said: And with EBITDA of around Rs. 70 crores, you can expect a PBT to be around Rs. 30 to 35 crores.
- By: Venkatesh Katwa, Q4 FY25 earnings call
- Due: this year
- Verdict: Missed
- Evidence: Standalone operating profit for FY26 came to ₹36 cr — short of the ₹70 cr promised, with the window closed.
- Filing: <https://www.bseindia.com/xml-data/corpfiling/AttachLive/27113215-a50b-4fda-97f6-b76ab9475e26.pdf> (page 6)

## 2025-06-02 · Newly commissioned kiln to reach rated capacity by the end of Q1 FY26.: Slipped

- Said: And as we speak, we are almost reached 77% of its rated capacity, expect to reach the rated capacity by the end of this quarter.
- By: Venkatesh Katwa, Q4 FY25 earnings call
- Due: end of this quarter
- Verdict: Slipped
- Evidence: The Q1 FY26 call, 15 Aug 2025 settles it: “So we should be able to have a full capacity by the end of Q2 without any challenges, because most of the challenges, it looks like we have already overcome on”
- Filing: <https://www.bseindia.com/xml-data/corpfiling/AttachLive/27113215-a50b-4fda-97f6-b76ab9475e26.pdf> (page 5)

## 2025-02-14 · Full-year top line should reach the previous year's level or slightly exceed it.: Unverifiable

- Said: But typically, I would say our top line should reach the level what we did last year or maybe a little higher.
- By: Venkatesh Katwa, Q3 FY25 earnings call
- Due: full fiscal year
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.
- Filing: <https://www.bseindia.com/xml-data/corpfiling/AttachLive/d01dcc25-f3e8-4331-82d3-abc305f8e773.pdf> (page 14)

## 2025-02-14 · Switch over to the new cement plant/kiln will take place in March within 20 to 25 days.: Unverifiable

- Said: That is why companies waiting to start the switchover process by the end of February or first week of March. Within 20-25 days we'll be switching over to the new kiln.
- By: Venkatesh Katwa, Q3 FY25 earnings call
- Due: end of February or first week of March
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.
- Filing: <https://www.bseindia.com/xml-data/corpfiling/AttachLive/d01dcc25-f3e8-4331-82d3-abc305f8e773.pdf> (page 13)