---
type: "Promise Ledger"
title: "Bansal Roofing Products Ltd: what management promised, and what happened"
description: "8 statements by Bansal Roofing Products Ltd's management, each checked against the company's later filings: 8 pending."
resource: "https://eqdoc.com/stock/538546"
tags: ["promise ledger","management guidance","india","538546"]
sources: [{"resource":"https://www.bseindia.com/xml-data/corpfiling/AttachLive/7c1e8615-ffc1-4dbb-aa85-682f5c78c9c9.pdf"}]
generated: {"by":"process:eqdoc-promise-audit"}
x-eqdoc-symbol: "538546"
x-eqdoc-counts: {"kept":0,"slipped":0,"missed":0,"pending":8,"unverifiable":0}
---

# How to read this

Each entry is something management said it would do, when it said it, and whether the company's later filings show it happened.
- **Kept**: a later filing shows it done. **Slipped**: done late or in part. **Missed**: the deadline passed without it.
- **Pending**: the deadline has not come, or no later filing yet speaks to it. **Unverifiable**: no filing could settle it.
- Evidence is either a sentence built from figures the company filed, or a quote from a later company document, as marked.

# Promises

## 2026-08-13 · Capex debt of ₹5 crore will be repaid over the next four years.: Pending

- Said: this year we introduced debt, for additional machinery CAPEX of Rs5 CR, and the repayment plan, is for the next four years.
- By: management, Q1 FY27 earnings call
- Due: the next four years
- Verdict: Pending
- Evidence: Not due yet, so it can't be checked.
- Filing: <https://www.bseindia.com/xml-data/corpfiling/AttachLive/7c1e8615-ffc1-4dbb-aa85-682f5c78c9c9.pdf> (page 8)

## 2026-08-13 · PEB structure production capacity will increase to 15,000 metric tons per annum.: Pending

- Said: After expansion the capacity has gone from 9600 metric ton to 15000 metric ton per annum.
- By: management, Q1 FY27 earnings call
- Verdict: Pending
- Evidence: Not due yet, so it can't be checked.
- Filing: <https://www.bseindia.com/xml-data/corpfiling/AttachLive/7c1e8615-ffc1-4dbb-aa85-682f5c78c9c9.pdf> (page 5)

## 2026-08-13 · Phase 5 and Phase 6 expansion projects are expected to be completed by mid-September 2026.: Pending

- Said: Both phases are under construction and are expected to be completed by mid-September 2026.
- By: management, Q1 FY27 earnings call
- Due: mid-September 2026
- Verdict: Pending
- Evidence: Not due until 30 Sep 2026, after the latest results; later ones will show.
- Filing: <https://www.bseindia.com/xml-data/corpfiling/AttachLive/7c1e8615-ffc1-4dbb-aa85-682f5c78c9c9.pdf> (page 5)

## 2026-08-13 · Phase 6 will contribute approximately 200 metric tons per month of light fabrication PEB capacity.: Pending

- Said: Upon commencement, Phase 6 is expected to contribute approximately 200 metric tons per month of additional light fabrication PEP capacity.
- By: management, Q1 FY27 earnings call
- Verdict: Pending
- Evidence: Not due yet, so it can't be checked.
- Filing: <https://www.bseindia.com/xml-data/corpfiling/AttachLive/7c1e8615-ffc1-4dbb-aa85-682f5c78c9c9.pdf> (page 5)

## 2026-08-13 · Purlin production capacity will reach 3,600 metric tons post-expansion.: Pending

- Said: and after expansion the capacity of production of Purlin has reached from 1500 tons to 3600 metric ton.
- By: management, Q1 FY27 earnings call
- Verdict: Pending
- Evidence: Not due yet, so it can't be checked.
- Filing: <https://www.bseindia.com/xml-data/corpfiling/AttachLive/7c1e8615-ffc1-4dbb-aa85-682f5c78c9c9.pdf> (page 5)

## 2026-08-13 · Roofing sheet production capacity will expand to 15,000 tons per annum.: Pending

- Said: After expansion, the capacity will reach from 10,000 tons per annum to 15,000 tons per annum.
- By: management, Q1 FY27 earnings call
- Verdict: Pending
- Evidence: Not due yet, so it can't be checked.
- Filing: <https://www.bseindia.com/xml-data/corpfiling/AttachLive/7c1e8615-ffc1-4dbb-aa85-682f5c78c9c9.pdf> (page 5)

## 2026-08-13 · Solar Module Mounting Structure machinery will be operational in Q2 FY27.: Pending

- Said: The advanced high-speed roll forming machinery required for this segment was installed and became operational during quarter Q2 FY27. We will be operating in quarter Q2 FY27.
- By: management, Q1 FY27 earnings call
- Due: quarter Q2 FY27
- Verdict: Pending
- Evidence: Not due until 30 Sep 2026, after the latest results; later ones will show.
- Filing: <https://www.bseindia.com/xml-data/corpfiling/AttachLive/7c1e8615-ffc1-4dbb-aa85-682f5c78c9c9.pdf> (page 5)

## 2026-08-13 · The company expects full-year revenue to reach between ₹180 crore and ₹200 crore.: Pending

- Said: So, we can see this year target is roughly Rs200 crore Rs180 to Rs 200 crore.
- By: management, Q1 FY27 earnings call
- Due: this year
- Verdict: Pending
- Evidence: Not due until 31 Mar 2027, after the latest results; later ones will show.
- Filing: <https://www.bseindia.com/xml-data/corpfiling/AttachLive/7c1e8615-ffc1-4dbb-aa85-682f5c78c9c9.pdf> (page 7)

Live record: https://eqdoc.com/stock/538546. Not investment advice.
