type: "Promise Ledger"
title: "Kalyani Cast-Tech Ltd: what management promised, and what happened"
description: "8 statements by Kalyani Cast-Tech Ltd's management, each checked against the company's later filings: 3 pending, 5 unverifiable."
resource: "https://eqdoc.com/stock/544023"
tags: ["promise ledger","management guidance","india","544023"]
sources: [{"resource":"https://www.bseindia.com/xml-data/corpfiling/AttachLive/477df1a3-fde7-4b9c-bd77-d1ed9bf4a2ca.pdf"}]
generated: {"by":"process:eqdoc-promise-audit"}
x-eqdoc-symbol: "544023"
x-eqdoc-counts: {"kept":0,"slipped":0,"missed":0,"pending":3,"unverifiable":5}
---

# How to read this

Each entry is something management said it would do, when it said it, and whether the company's later filings show it happened.
- **Kept**: a later filing shows it done. **Slipped**: done late or in part. **Missed**: the deadline passed without it.
- **Pending**: the deadline has not come, or no later filing yet speaks to it. **Unverifiable**: no filing could settle it.
- Evidence is either a sentence built from figures the company filed, or a quote from a later company document, as marked.

# Promises

## 2025-11-15 · Commercial operations at the wagon factory will start in H2 FY27.: Pending

- Said: But wagon factory may be 80 % ready, but commercial operation will start only for the next H2 of the FY '26-'27.
- By: Naresh Kumar, Q2 FY26 earnings call
- Due: next H2 of the FY '26-'27
- Verdict: Pending
- Evidence: Not due until 31 Mar 2027, after the latest results; later ones will show.
- Filing: <https://www.bseindia.com/xml-data/corpfiling/AttachLive/477df1a3-fde7-4b9c-bd77-d1ed9bf4a2ca.pdf> (page 16)

## 2025-11-15 · Operating margins will remain in the range of 10% to 12%.: Unverifiable

- Said: No, I have been telling that our margins will be 10% to 12%. Sometimes it will be 10%, sometimes it will be 11%, sometimes it will be 12%.
- By: Naresh Kumar, Q2 FY26 earnings call
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.
- Filing: <https://www.bseindia.com/xml-data/corpfiling/AttachLive/477df1a3-fde7-4b9c-bd77-d1ed9bf4a2ca.pdf> (page 7)

## 2025-11-15 · The Gati Shakti Rail Terminal will be commissioned by March 31st.: Unverifiable

- Said: Gati Shakti is a railway given as a target by 31st March, we have to anyway commission it.
- By: Naresh Kumar, Q2 FY26 earnings call
- Due: by 31st March
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.
- Filing: <https://www.bseindia.com/xml-data/corpfiling/AttachLive/477df1a3-fde7-4b9c-bd77-d1ed9bf4a2ca.pdf> (page 6)

## 2025-11-15 · The company will set up a wagon manufacturing unit with an annual capacity of 7,500 to 7,800 units, starting with a 2,50: Pending

- Said: We will be setting up the wagon manufacturing unit with annual capacity of 7500 to 7800 units per year. The first phase for the capacity of 2500 is under construction.
- By: Naresh Kumar, Q2 FY26 earnings call
- Verdict: Pending
- Evidence: Not due yet, so it can't be checked.
- Filing: <https://www.bseindia.com/xml-data/corpfiling/AttachLive/477df1a3-fde7-4b9c-bd77-d1ed9bf4a2ca.pdf> (page 5)

## 2025-11-15 · The container capacity will be completed and ready by March 31st.: Unverifiable

- Said: The container will be ready by that because 80% of the said work is over and only 20% is left.
- By: Naresh Kumar, Q2 FY26 earnings call
- Due: By 31st March
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.
- Filing: <https://www.bseindia.com/xml-data/corpfiling/AttachLive/477df1a3-fde7-4b9c-bd77-d1ed9bf4a2ca.pdf> (page 6)

## 2025-11-15 · The remaining 1.8 kilometers of rail line will be completed by January 15th.: Unverifiable

- Said: Rest of 1.8 kilometers, we will be completing maybe by 15th of January.
- By: Naresh Kumar, Q2 FY26 earnings call
- Due: by 15th of January
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.
- Filing: <https://www.bseindia.com/xml-data/corpfiling/AttachLive/477df1a3-fde7-4b9c-bd77-d1ed9bf4a2ca.pdf> (page 17)

## 2025-11-15 · Total investment in the project will be approximately INR 170 crores to INR 200 crores funded via debt and internal accr: Pending

- Said: We will be investing almost INR170 crores to INR200 crores. Out of which we have planned to take debt to some amount and some amount we will from our internal generation.
- By: Naresh Kumar, Q2 FY26 earnings call
- Verdict: Pending
- Evidence: Not due yet, so it can't be checked.
- Filing: <https://www.bseindia.com/xml-data/corpfiling/AttachLive/477df1a3-fde7-4b9c-bd77-d1ed9bf4a2ca.pdf> (page 16)

## 2025-11-15 · Wagon plant machinery will begin arriving starting the following week.: Unverifiable

- Said: We have already ordered the machines and the machine will start coming from next week.
- By: Naresh Kumar, Q2 FY26 earnings call
- Due: from next week
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.
- Filing: <https://www.bseindia.com/xml-data/corpfiling/AttachLive/477df1a3-fde7-4b9c-bd77-d1ed9bf4a2ca.pdf> (page 8)

Live record: https://eqdoc.com/stock/544023. Not investment advice.