---
type: "Promise Ledger"
title: "Karbonsteel Engineering Ltd: what management promised, and what happened"
description: "12 statements by Karbonsteel Engineering Ltd's management, each checked against the company's later filings: 3 pending, 9 unverifiable."
resource: "https://eqdoc.com/stock/544511"
tags: ["promise ledger","management guidance","india","544511"]
sources: [{"resource":"https://eqdoc.com/pdf/ann/6943187.pdf"}]
generated: {"by":"process:eqdoc-promise-audit"}
x-eqdoc-symbol: "544511"
x-eqdoc-counts: {"kept":0,"slipped":0,"missed":0,"pending":3,"unverifiable":9}
---

# How to read this

Each entry is something management said it would do, when it said it, and whether the company's later filings show it happened.
- **Kept**: a later filing shows it done. **Slipped**: done late or in part. **Missed**: the deadline passed without it.
- **Pending**: the deadline has not come, or no later filing yet speaks to it. **Unverifiable**: no filing could settle it.
- Evidence is either a sentence built from figures the company filed, or a quote from a later company document, as marked.

# Promises

## 2026-06-12 · Annual production levels are expected to hit around 40,000 tons at steel prices of about ₹100 per kg.: Unverifiable

- Said: In terms of production levels, we expect to hit about 40,000 tons on an annual basis, with steel prices at about 100 per kg for sales.
- By: MANAGEMENT, Q4 FY26 earnings call
- Due: annual basis
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.
- Filing: <https://eqdoc.com/pdf/ann/6943187.pdf> (page 6)

## 2026-06-12 · Capacity at Umargam will be expanded to 54,000 tons with completion by October 2025.: Unverifiable

- Said: We are expanding our current capacity at Umargam from 30,000 tons to 54,000 tons. This expansion is underway, with a revised completion timeline of October 2025.
- By: MANAGEMENT, Q4 FY26 earnings call
- Due: October 2025
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.
- Filing: <https://eqdoc.com/pdf/ann/6943187.pdf> (page 4)

## 2026-06-12 · Capacity utilization for FY26 is expected to be between 80% and 90%, manufacturing over 40,000 tons.: Unverifiable

- Said: For FY26, we expect it to be around 80-90%. We anticipate manufacturing over 40,000 tons this year at a price of approximately 100 per kg.
- By: MANAGEMENT, Q4 FY26 earnings call
- Due: FY26
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.
- Filing: <https://eqdoc.com/pdf/ann/6943187.pdf> (page 8)

## 2026-06-12 · Construction and machinery installation for Sheds 1 and 2 will be completed by October 2025.: Unverifiable

- Said: Sheds 1 and 2 are under construction, with 60% completed. We expect to finish everything, including machinery installation, by October 2025.
- By: MANAGEMENT, Q4 FY26 earnings call
- Due: October 2025
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.
- Filing: <https://eqdoc.com/pdf/ann/6943187.pdf> (page 4)

## 2026-06-12 · Management targets ₹400 crores in revenue backed by at least ₹500 crores in order inflows.: Unverifiable

- Said: We target an order book to revenue ratio where we have at least 500 crores in orders for a 400 crore revenue target, carrying 100 crores over.
- By: MANAGEMENT, Q4 FY26 earnings call
- Due: this financial year
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.
- Filing: <https://eqdoc.com/pdf/ann/6943187.pdf> (page 10)

## 2026-06-12 · Normalized operating margin is expected to reach the range of 12% to 13%.: Unverifiable

- Said: We expect a normalized margin in the range of 12-13%.
- By: MANAGEMENT, Q4 FY26 earnings call
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.
- Filing: <https://eqdoc.com/pdf/ann/6943187.pdf> (page 6)

## 2026-06-12 · PAT margins are projected to be around 4-5% for FY26.: Unverifiable

- Said: They should be around 4-5% for FY26 and move above 5% for FY27.
- By: MANAGEMENT, Q4 FY26 earnings call
- Due: FY26 and FY27
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.
- Filing: <https://eqdoc.com/pdf/ann/6943187.pdf> (page 7)

## 2026-06-12 · Return on equity should range between 17% and 19% on a ₹115 crore net worth.: Unverifiable

- Said: On a 115 crore net worth, our ROE should be in the range of 17% to 19%.
- By: MANAGEMENT, Q4 FY26 earnings call
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.
- Filing: <https://eqdoc.com/pdf/ann/6943187.pdf> (page 11)

## 2026-06-12 · The company plans to invest an additional ₹10 to 15 crores in capex in the next year.: Pending

- Said: We have 21 crores in work-in-progress, and in the next year, we will invest another 10-15 crores in capex.
- By: MANAGEMENT, Q4 FY26 earnings call
- Due: in the next year
- Verdict: Pending
- Evidence: Not due yet, so it can't be checked.
- Filing: <https://eqdoc.com/pdf/ann/6943187.pdf> (page 8)

## 2026-06-12 · The company targets reaching full capacity of 54,000 tons in the following year.: Pending

- Said: For the following year, we intend to reach the full capacity of 54,000 tons.
- By: MANAGEMENT, Q4 FY26 earnings call
- Due: the following year
- Verdict: Pending
- Evidence: Not due yet, so it can't be checked.
- Filing: <https://eqdoc.com/pdf/ann/6943187.pdf> (page 6)

## 2026-06-12 · The company targets reaching ₹800 to ₹1,000 crores in revenue post-FY27.: Pending

- Said: To reach 800-1,000 crores in revenue and produce 7,000-8,000 tons a month, we will need more expansion post-FY27.
- By: MANAGEMENT, Q4 FY26 earnings call
- Due: post-FY27
- Verdict: Pending
- Evidence: Not due until 31 Mar 2027, after the latest results; later ones will show.
- Filing: <https://eqdoc.com/pdf/ann/6943187.pdf> (page 7)

## 2026-06-12 · Total capital expenditure for solar expansion will be around ₹3 to 3.5 crores.: Unverifiable

- Said: The cost is about 25 to 29 per KVA, so we expect the total cost to be about 3-3.5 crores for the solar expansion.
- By: MANAGEMENT, Q4 FY26 earnings call
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.
- Filing: <https://eqdoc.com/pdf/ann/6943187.pdf> (page 6)

Live record: https://eqdoc.com/stock/544511. Not investment advice.
