title: "GRE Renew Enertech Ltd: what management promised, and what happened"
description: "8 statements by GRE Renew Enertech Ltd's management, each checked against the company's later filings: 5 pending, 3 unverifiable."
resource: "https://eqdoc.com/stock/544682"
tags: ["promise ledger","management guidance","india","544682"]
sources: [{"resource":"https://eqdoc.com/pdf/ann/7549613.pdf"}]
generated: {"by":"process:eqdoc-promise-audit"}
x-eqdoc-symbol: "544682"
x-eqdoc-counts: {"kept":0,"slipped":0,"missed":0,"pending":5,"unverifiable":3}
---

# How to read this

Each entry is something management said it would do, when it said it, and whether the company's later filings show it happened.
- **Kept**: a later filing shows it done. **Slipped**: done late or in part. **Missed**: the deadline passed without it.
- **Pending**: the deadline has not come, or no later filing yet speaks to it. **Unverifiable**: no filing could settle it.
- Evidence is either a sentence built from figures the company filed, or a quote from a later company document, as marked.

# Promises

## 2026-11-18 · Commission the 1 MW rooftop solar project at Rashtrapati Bhawan in the coming months.: Pending

- Said: The project will be commissioned in the coming months. So, from there also, for the next 25 years, we will get our revenue.
- By: Alpeshkumar Agrawal, Q2 FY27 earnings call
- Due: in the coming months
- Verdict: Pending
- Evidence: Not due yet, so it can't be checked.
- Filing: <https://eqdoc.com/pdf/ann/7549613.pdf> (page 8)

## 2026-11-18 · Commission the ongoing 10.5 MW IPP project in coming months to take total IPP capacity to roughly 25-26 MW.: Pending

- Said: It will be commissioned in the coming months. So, roughly 25 - 26 MW will be our IPP now. And from there, our continuous income will come.
- By: Alpeshkumar Agrawal, Q2 FY27 earnings call
- Due: in the coming months
- Verdict: Pending
- Evidence: Not due yet, so it can't be checked.
- Filing: <https://eqdoc.com/pdf/ann/7549613.pdf> (page 8)

## 2026-11-18 · Convert 70% to 80% of the EPC order book in H2 FY27.: Pending

- Said: We can expect conversion up to 70% to 80% of the order book.
- By: Alpeshkumar Agrawal, Q2 FY27 earnings call
- Due: H2 FY’27
- Verdict: Pending
- Evidence: Not due until 31 Mar 2027, after the latest results; later ones will show.
- Filing: <https://eqdoc.com/pdf/ann/7549613.pdf> (page 10)

## 2026-11-18 · Directly introduce Battery Energy Storage Solutions as soon as Gujarat finalizes its draft policy.: Pending

- Said: So as soon as it is finalized, we will directly introduce BESS. We have kept our team ready in the back end.
- By: Kamleskumar Patel, Q2 FY27 earnings call
- Verdict: Pending
- Evidence: Not due yet, so it can't be checked.
- Filing: <https://eqdoc.com/pdf/ann/7549613.pdf> (page 12)

## 2026-11-18 · Fund upcoming RESCO projects with a 25:75 split between internal accruals and bank finance.: Unverifiable

- Said: normally these projects work at 25:75 ratio. So 25% of the funding is done from own accruals and 75% of the funding for the project is done from bank finance.
- By: Alpeshkumar Agrawal, Q2 FY27 earnings call
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.
- Filing: <https://eqdoc.com/pdf/ann/7549613.pdf> (page 11)

## 2026-11-18 · Generate a long-term recurring revenue stream for up to 25 years through the RESCO model alongside EPC operations.: Unverifiable

- Said: this business provides an additional source of revenue along with our EPC operations and this income provides us with a long-term revenue stream for up to 25 years.
- By: Alpeshkumar Agrawal, Q2 FY27 earnings call
- Due: up to 25 years
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.
- Filing: <https://eqdoc.com/pdf/ann/7549613.pdf> (page 9)

## 2026-11-18 · Halt further development of the LED business to focus purely on the solar sector.: Unverifiable

- Said: and we are not going forward to develop our LED, and we want to purely focus on our solar side.
- By: Alpeshkumar Agrawal, Q2 FY27 earnings call
- Due: future years
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.
- Filing: <https://eqdoc.com/pdf/ann/7549613.pdf> (page 12)

## 2026-11-18 · Overall margins will face pressure until execution of the 50 MW project concludes across H2 FY27 and H1 FY28.: Pending

- Said: until the execution of this particular project is completed in the second half of FY27 and the first half of FY28, you will see pressure on the overall margins
- By: Alpeshkumar Agrawal, Q2 FY27 earnings call
- Due: the second half of FY27 and the first half of FY28
- Verdict: Pending
- Evidence: Not due until 31 Mar 2027, after the latest results; later ones will show.
- Filing: <https://eqdoc.com/pdf/ann/7549613.pdf> (page 10)