---
type: "Promise Ledger"
title: "AIA Engineering Ltd: what management promised, and what happened"
description: "17 statements by AIA Engineering Ltd's management, each checked against the company's later filings: 3 kept, 1 slipped, 1 missed, 7 pending, 5 unverifiable."
resource: "https://eqdoc.com/stock/AIAENG"
tags: ["promise ledger","management guidance","india","aiaeng"]
sources: [{"resource":"https://nsearchives.nseindia.com/corporate/AIAENG_28052025161154_SubmissionofTranscript23052025.pdf"},{"resource":"https://nsearchives.nseindia.com/corporate/AIAENG_09022024150847_SubmissionofTranscript07022024.pdf"}]
generated: {"by":"process:eqdoc-promise-audit","at":"2026-10-07"}
stale_after: "2027-01-15"
x-eqdoc-symbol: "AIAENG"
x-eqdoc-counts: {"kept":3,"slipped":1,"missed":1,"pending":7,"unverifiable":5}
---

# How to read this

Each entry is something management said it would do, when it said it, and whether the company's later filings show it happened.
- **Kept**: a later filing shows it done. **Slipped**: done late or in part. **Missed**: the deadline passed without it.
- **Pending**: the deadline has not come, or no later filing yet speaks to it. **Unverifiable**: no filing could settle it.
- Evidence is either a sentence built from figures the company filed, or a quote from a later company document, as marked.

# Promises

## 2026-01-30 · The company expects to have both Ghana and China facilities in place within 1.5 to 2 years.: Pending

- Said: But you can say over the next 1.5 to 2 years, we should have both the facilities in place.
- By: Sanjay Majmudar, Q3 FY26 earnings call
- Verdict: Pending
- Evidence: Not due until 28 Jan 2028, after the latest results; later ones will show.

## 2026-01-30 · The company will spend approximately INR30 crores on new solar hybrid capacity in Q4.: Pending

- Said: Balance INR75 crores, INR80 crores, around INR30 crores is for our new solar hybrid capacity, which is committed, and which is 100% going to happen in Q4.
- By: Sanjay Majmudar, Q3 FY26 earnings call
- Verdict: Pending
- Evidence: Not due yet, so it can't be checked.

## 2025-08-13 · The company expects 55% of its power to come from renewable sources by the end of the current fiscal year.: Unverifiable

- Said: when all of it gets commissioned in next -- in this fiscal year, almost 55% of our power will come from green sources, from renewable sources.
- By: Kunal Shah, Q1 FY26 earnings call
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.

## 2025-08-13 · The company expects the current high margins to normalize over the next two quarters.: Unverifiable

- Said: there is an abnormal margin this quarter, which we think will normalize over the next two quarters.
- By: Kunal Shah, Q1 FY26 earnings call
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.

## 2025-05-28 · China plant phase 1 operational: Pending

- Said: and we expect China to be on ground and start getting at least the first phase operational by the end of this fiscal.
- Due: FY26
- Verdict: Pending
- Filing: <https://nsearchives.nseindia.com/corporate/AIAENG_28052025161154_SubmissionofTranscript23052025.pdf>

## 2025-05-28 · capex for China and Ghana plants: Pending

- Said: plus we will be spending over the next 2, 2.5 years on the two plants in -- one in China and one in Ghana.
- Due: FY28
- Verdict: Pending
- Filing: <https://nsearchives.nseindia.com/corporate/AIAENG_28052025161154_SubmissionofTranscript23052025.pdf>

## 2025-05-28 · maintenance capex plan: Kept

- Said: Outside of these two projects, we're looking at about INR120 crores, INR130 crores of capex, which is largely some amount of renewable power, balance capex for work that we have done in our plants
- Due: FY26
- Verdict: Kept
- Later filing says (2026-05-26): Capex incurred during FY–2026 : Rs. 104 Crores.
- Filing: <https://nsearchives.nseindia.com/corporate/AIAENG_28052025161154_SubmissionofTranscript23052025.pdf>

## 2025-05-28 · volume reset from customer inventory correction: Kept

- Said: I think, let's say, in a quarter's time, at least that volume on a rolling 12-month basis, we are hopeful will reset about 8,000 to 10,000 tons.
- Due: Q2 FY26
- Verdict: Kept
- Later filing says (2025-08-18): Yes, there are two, three different things that were happening, two customers going to a restocking, they're back to -- that volume looks to be back, that will normalize, yes.
- Filing: <https://nsearchives.nseindia.com/corporate/AIAENG_28052025161154_SubmissionofTranscript23052025.pdf>

## 2025-02-07 · The company expects full-year sales volume to be between 250,000 and 260,000 tons.: Unverifiable

- Said: So with that, our full year volume, which is 187,000 tons for the 9 months, looks to be between 250,000 and 260,000 depending on invoicing, etcetera, is the guidance
- By: Kunal Shah, Q3 FY25 earnings call
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.

## 2024-10-30 · The company expects a 10% decline in revenue volume for the full year.: Unverifiable

- Said: It looks to be a 10% lower revenue volume either way, whichever way you slice it for this full year.
- By: Kunal Shah, Q2 FY25 earnings call
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.

## 2024-08-12 · The company expects the approved Rs. 500 crore buyback to be completed in the coming weeks.: Unverifiable

- Said: Board approved a buyback of Rs. 500 crores. So, that should be getting through in the next few days, next few weeks.
- By: Kunal Shah, Q1 FY25 earnings call
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.

## 2024-08-12 · The company expects to commission the new Brownfield expansion facility by the end of 2024.: Slipped

- Said: We expect this facility to be commissioned towards the end of this year.
- By: Kunal Shah, Q1 FY25 earnings call
- Verdict: Slipped
- Evidence: The Q3 FY26 call, 30 Jan 2026 settles it: “But you can say over the next 1.5 to 2 years, we should have both the facilities in place.”

## 2024-02-09 · Capex spending target: Pending

- Said: We have done target another 150 odd crores in the current fiscal and then another about 200 odd crores in ‘24-25. So, all those expansion projects are on stream.
- Due: FY25
- Verdict: Pending
- Filing: <https://nsearchives.nseindia.com/corporate/AIAENG_09022024150847_SubmissionofTranscript07022024.pdf>

## 2024-02-09 · FY24 sales volume target: Pending

- Said: We target to be closer to 300 for the full year up from 291 for full year last year. So overall about a 10,000 tons growth.
- Due: FY24
- Verdict: Pending
- Filing: <https://nsearchives.nseindia.com/corporate/AIAENG_09022024150847_SubmissionofTranscript07022024.pdf>

## 2024-02-09 · FY25 incremental sales volume target: Missed

- Said: As we explained actually our target is about 25,000 to 30,000 tons for FY24-25.
- Due: FY25
- Verdict: Missed
- Later filing says (2025-05-28): We sold 68,741 tons this quarter, and that brought our full year sales to 255,000 tons
- Filing: <https://nsearchives.nseindia.com/corporate/AIAENG_09022024150847_SubmissionofTranscript07022024.pdf>

## 2024-02-09 · Grinding media plant capex: Pending

- Said: We had identified 600 crores of total CAPEX, of which 500 crores of total CAPEX of which 200 crores was to go into the grinding media plant which we are on track.
- Verdict: Pending
- Filing: <https://nsearchives.nseindia.com/corporate/AIAENG_09022024150847_SubmissionofTranscript07022024.pdf>

## 2024-02-09 · Realization range outlook: Kept

- Said: As far as our realization is concerned, we expect it to between 150 and 160 depending on the product mix.
- Verdict: Kept
- Later filing says (2024-05-16): Our revenue for the full year is at Rs. 1,130 crores and that translates to a realization of about Rs. 158 per kilo.
- Filing: <https://nsearchives.nseindia.com/corporate/AIAENG_09022024150847_SubmissionofTranscript07022024.pdf>

Live record: https://eqdoc.com/stock/AIAENG. Not investment advice.
