type: "Promise Ledger"
title: "Apollo Micro Systems Ltd: what management promised, and what happened"
description: "41 statements by Apollo Micro Systems Ltd's management, each checked against the company's later filings: 2 kept, 1 slipped, 1 missed, 25 pending, 12 unverifiable."
resource: "https://eqdoc.com/stock/APOLLO"
tags: ["promise ledger","management guidance","india","apollo"]
sources: [{"resource":"https://eqdoc.com/pdf/ann/7437079.pdf"},{"resource":"https://nsearchives.nseindia.com/corporate/APOLLO_10082026222511_AMS_Earning_calls_transcript10082026.pdf"},{"resource":"https://nsearchives.nseindia.com/corporate/APOLLO_08082026162233_AMS_Investor_Presentation.pdf"},{"resource":"https://eqdoc.com/pdf/ann/7140216.pdf"},{"resource":"https://nsearchives.nseindia.com/corporate/APOLLO_12022026123243_Earning_Call_Transcript0902026.pdf"},{"resource":"https://nsearchives.nseindia.com/corporate/APOLLO_08112025114726_AMS_SE_Transcript_of_the_Q2_Earnings_Conference_Call-Signed.pdf"},{"resource":"https://nsearchives.nseindia.com/corporate/APOLLO_07082025161308_AMS_SE_Transcript_of_the_Q1_Earnings_Conference_Call.pdf"},{"resource":"https://nsearchives.nseindia.com/corporate/APOLLO_11022025212858_AMS_SE_Transcript_of_the_Q3_Earnings_Conference_Call.pdf"}]
generated: {"by":"process:eqdoc-promise-audit","at":"2026-10-29"}
stale_after: "2027-02-06"
x-eqdoc-symbol: "APOLLO"
x-eqdoc-counts: {"kept":2,"slipped":1,"missed":1,"pending":25,"unverifiable":12}
---

# How to read this

Each entry is something management said it would do, when it said it, and whether the company's later filings show it happened.
- **Kept**: a later filing shows it done. **Slipped**: done late or in part. **Missed**: the deadline passed without it.
- **Pending**: the deadline has not come, or no later filing yet speaks to it. **Unverifiable**: no filing could settle it.
- Evidence is either a sentence built from figures the company filed, or a quote from a later company document, as marked.

# Promises

## 2026-10-24 · Trials for the Vehicle Mounted Counter Drone Systems will be initiated in this Financial Year.: Pending

- Said: The trials will be initiated in this Financial Year.
- By: Company presentation, Investor presentation, 24 Oct 2026
- Due: in this Financial Year
- Verdict: Pending
- Evidence: Not due yet, so it can't be checked.
- Filing: <https://eqdoc.com/pdf/ann/7437079.pdf> (page 40)

## 2026-08-10 · Limpet mine order inflow: Pending

- Said: limpet mine, we maybe start getting orders, maybe 4th quarter onwards, maybe we are expecting orders.
- Due: Q4 FY27
- Verdict: Pending
- Filing: <https://nsearchives.nseindia.com/corporate/APOLLO_10082026222511_AMS_Earning_calls_transcript10082026.pdf>

## 2026-08-10 · MIGM production commencement: Pending

- Said: MIGM production will start from next financial year, because we are expecting this order in this financial year.
- Due: FY28
- Verdict: Pending
- Filing: <https://nsearchives.nseindia.com/corporate/APOLLO_10082026222511_AMS_Earning_calls_transcript10082026.pdf>

## 2026-08-10 · MIGM purchase order receipt: Pending

- Said: Like order, we are expecting by December or January, we are expecting the purchase order.
- Due: 2027-01-31
- Verdict: Pending
- Filing: <https://nsearchives.nseindia.com/corporate/APOLLO_10082026222511_AMS_Earning_calls_transcript10082026.pdf>

## 2026-08-10 · Promoter pledge reduction to zero: Pending

- Said: I think, it is going to take another 1 year to close all the pledge part.
- Due: Q1 FY28
- Verdict: Pending
- Filing: <https://nsearchives.nseindia.com/corporate/APOLLO_10082026222511_AMS_Earning_calls_transcript10082026.pdf>

## 2026-08-10 · Revenue growth guidance: Pending

- Said: Somewhere in between 40% to 45% is the continued growth that we will continue to demonstrate, in this financial year onwards.
- Due: FY27
- Verdict: Pending
- Filing: <https://nsearchives.nseindia.com/corporate/APOLLO_10082026222511_AMS_Earning_calls_transcript10082026.pdf>

## 2026-08-10 · Unit III full production start: Pending

- Said: Maybe the final production as a complete production activity, I think before March '27, we are going to start.
- Due: 2027-03-31
- Verdict: Pending
- Filing: <https://nsearchives.nseindia.com/corporate/APOLLO_10082026222511_AMS_Earning_calls_transcript10082026.pdf>

## 2026-08-08 · Convert this year's first export order into a sustained international revenue stream.: Pending

- Said: converting this year's first export order into a sustained international revenue stream.
- By: Company presentation, Investor presentation, 8 Aug 2026
- Due: 2027-03-31
- Verdict: Pending
- Evidence: Not due until 31 Mar 2027, after the latest results; later ones will show.
- Filing: <https://nsearchives.nseindia.com/corporate/APOLLO_08082026162233_AMS_Investor_Presentation.pdf> (page 5)

## 2026-08-08 · Enter production phase for Limpet Mines.: Pending

- Said: Limpet Mines are entering the Production Phase.
- By: Company presentation, Investor presentation, 8 Aug 2026
- Verdict: Pending
- Evidence: Not due yet, so it can't be checked.
- Filing: <https://eqdoc.com/pdf/ann/7140216.pdf> (page 16)

## 2026-08-08 · Enter production phase for the Multi-Influence Ground Mine program.: Pending

- Said: Program is entering production phase.
- By: Company presentation, Investor presentation, 8 Aug 2026
- Verdict: Pending
- Evidence: Not due yet, so it can't be checked.
- Filing: <https://eqdoc.com/pdf/ann/7140216.pdf> (page 14)

## 2026-08-08 · Execute backward integration into key chemicals and energetics for defence explosives.: Pending

- Said: Backward integration into key chemicals and energetics for Defence explosives
- By: Company presentation, Investor presentation, 8 Aug 2026
- Verdict: Pending
- Evidence: Not due yet, so it can't be checked.
- Filing: <https://eqdoc.com/pdf/ann/7140216.pdf> (page 12)

## 2026-08-08 · Execute greenfield expansion with a total investment of INR 300 crores.: Pending

- Said: Total investment of INR 300 crores which also includes a land bank of approx. 2,47,441 sq ft strategically located adjacent to Unit 3 at the Industrial Park,
- By: Company presentation, Investor presentation, 8 Aug 2026
- Verdict: Pending
- Evidence: Not due yet, so it can't be checked.
- Filing: <https://eqdoc.com/pdf/ann/7140216.pdf> (page 49)

## 2026-08-08 · Grow into a Global Original Equipment Manufacturer over the next ten years.: Pending

- Said: To grow as a Global Original Equipment Manufacturer over the next ten years
- By: Company presentation, Investor presentation, 8 Aug 2026
- Due: next ten years
- Verdict: Pending
- Evidence: Not due yet, so it can't be checked.
- Filing: <https://nsearchives.nseindia.com/corporate/APOLLO_08082026162233_AMS_Investor_Presentation.pdf> (page 5)

## 2026-08-08 · Scale operations to 12x capacity via greenfield expansion.: Pending

- Said: Scaling Operations to 12x capacity.
- By: Company presentation, Investor presentation, 8 Aug 2026
- Verdict: Pending
- Evidence: Not due yet, so it can't be checked.
- Filing: <https://eqdoc.com/pdf/ann/7140216.pdf> (page 49)

## 2026-02-09 · At least one or two pipeline acquisitions to be completed before the end of the financial year.: Pending

- Said: three companies are in pipeline and at least one or two companies' acquisition we want to complete before this financial year end.
- By: Karunakar Reddy, Q3 FY26 earnings call
- Due: before this financial year end
- Verdict: Pending
- Evidence: Not due yet, so it can't be checked.
- Filing: <https://nsearchives.nseindia.com/corporate/APOLLO_12022026123243_Earning_Call_Transcript0902026.pdf> (page 6)

## 2026-02-09 · IDL Explosives expected to turn EBITDA- and PAT-positive starting Q1 FY27.: Unverifiable

- Said: From next financial year Q1 onwards, the EBITDA level and at a PAT level it was going to be a positive PAT, a positive EBITDA company actually.
- By: Sai Kumar, Q3 FY26 earnings call
- Due: From next financial year Q1 onwards
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.
- Filing: <https://nsearchives.nseindia.com/corporate/APOLLO_12022026123243_Earning_Call_Transcript0902026.pdf> (page 11)

## 2025-11-08 · IDL turnaround to profitability: Kept

- Said: I think by Q2 next financial year, I think we should be in a position to make some good turnaround.
- Due: Q2 FY27
- Verdict: Kept
- Later filing says (2026-08-10): And this financial year, you know, Q1, it is PAT positive, but, you know, the profitability is was very less.
- Filing: <https://nsearchives.nseindia.com/corporate/APOLLO_08112025114726_AMS_SE_Transcript_of_the_Q2_Earnings_Conference_Call-Signed.pdf>

## 2025-11-08 · Promoter pledge reduction to zero: Pending

- Said: Next six months' time, I'm going to close all the pledge part. That's what I'm planning.
- Due: 2026-05-05
- Verdict: Pending
- Filing: <https://nsearchives.nseindia.com/corporate/APOLLO_08112025114726_AMS_SE_Transcript_of_the_Q2_Earnings_Conference_Call-Signed.pdf>

## 2025-11-05 · Core business revenue guided to grow at a CAGR of 45% to 50% over FY26 and FY27.: Unverifiable

- Said: Looking ahead, we expect revenue to grow at a CAGR of 45% to 50% over FY26 and FY27 driven solely by the core business
- By: management, Q2 FY26 earnings call
- Due: FY26 and FY27
- Verdict: Unverifiable (a second reading found it pending)
- Evidence: We could not match this promise to a figure, and no later call settles it.
- Filing: <https://nsearchives.nseindia.com/corporate/APOLLO_08112025114726_AMS_SE_Transcript_of_the_Q2_Earnings_Conference_Call-Signed.pdf> (page 4)

## 2025-11-08 · Test equipment capex spend: Pending

- Said: Around INR60 cores, we are spending only on test equipment.
- Verdict: Pending
- Filing: <https://nsearchives.nseindia.com/corporate/APOLLO_08112025114726_AMS_SE_Transcript_of_the_Q2_Earnings_Conference_Call-Signed.pdf>

## 2025-11-08 · Unit 3 full production timeline: Slipped

- Said: full-fledged production will be starting from end of this financial year or probably by Q1 next financial year.
- Due: Q1 FY27
- Verdict: Slipped
- Later filing says (2026-08-10): Maybe the final production as a complete production activity, I think before March '27, we are going to start.
- Filing: <https://nsearchives.nseindia.com/corporate/APOLLO_08112025114726_AMS_SE_Transcript_of_the_Q2_Earnings_Conference_Call-Signed.pdf>

## 2025-11-08 · Unit 3 total capex investment: Pending

- Said: Total INR250 crores, what we are investing.
- Verdict: Pending
- Filing: <https://nsearchives.nseindia.com/corporate/APOLLO_08112025114726_AMS_SE_Transcript_of_the_Q2_Earnings_Conference_Call-Signed.pdf>

## 2025-11-05 · All promoter pledges will be closed within the next six months.: Unverifiable

- Said: Yes, definitely. Next six months' time, I'm going to close all the pledge part. That's what I'm planning.
- By: management, Q2 FY26 earnings call
- Due: next six months' time
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.
- Filing: <https://nsearchives.nseindia.com/corporate/APOLLO_08112025114726_AMS_SE_Transcript_of_the_Q2_Earnings_Conference_Call-Signed.pdf> (page 9)

## 2025-11-05 · Significant reduction in receivables by the end of FY26.: Unverifiable

- Said: So this financial year end, you will see a significant reduction in the receivables, actually.
- By: management, Q2 FY26 earnings call
- Due: this financial year end
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.
- Filing: <https://nsearchives.nseindia.com/corporate/APOLLO_08112025114726_AMS_SE_Transcript_of_the_Q2_Earnings_Conference_Call-Signed.pdf> (page 9)

## 2025-11-05 · Unit 3 will be fully operational by or before June end.: Unverifiable

- Said: By June end is going to be fully operational, before June.
- By: management, Q2 FY26 earnings call
- Due: By June end
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.
- Filing: <https://nsearchives.nseindia.com/corporate/APOLLO_08112025114726_AMS_SE_Transcript_of_the_Q2_Earnings_Conference_Call-Signed.pdf> (page 18)

## 2025-08-04 · Expects to receive an additional INR 325 crores from warrants within four months.: Unverifiable

- Said: Out of the warrants amount of INR400 plus crores, INR100 crores we have received another INR325 crores we are yet to receive within the next four months.
- By: Sai Kumar, Q1 FY26 earnings call
- Due: within the next four months
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.
- Filing: <https://nsearchives.nseindia.com/corporate/APOLLO_07082025161308_AMS_SE_Transcript_of_the_Q1_Earnings_Conference_Call.pdf> (page 20)

## 2025-08-04 · Operating margins are projected to improve in the first half of FY26.: Unverifiable

- Said: Operating margins are projected to improve in the first half of FY26 due to favorable operating leverage and product mix.
- By: Sai Kumar, Q1 FY26 earnings call
- Due: first half of FY26
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.
- Filing: <https://nsearchives.nseindia.com/corporate/APOLLO_07082025161308_AMS_SE_Transcript_of_the_Q1_Earnings_Conference_Call.pdf> (page 4)

## 2025-08-04 · QRSAM order expected before December.: Unverifiable

- Said: Anything -- I'm sure, I'm expecting before December, this QRSAM order we are expecting.
- By: B. Karunakar Reddy, Q1 FY26 earnings call
- Due: before December
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.
- Filing: <https://nsearchives.nseindia.com/corporate/APOLLO_07082025161308_AMS_SE_Transcript_of_the_Q1_Earnings_Conference_Call.pdf> (page 6)

## 2025-08-04 · Unit 3 operational launch planned by December.: Unverifiable

- Said: And Unit 3 also is getting ready. We are going to start occupying from October onwards. By December, we want to complete the operational listing. We want to start.
- By: management, Q1 FY26 earnings call
- Due: By December
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.
- Filing: <https://nsearchives.nseindia.com/corporate/APOLLO_07082025161308_AMS_SE_Transcript_of_the_Q1_Earnings_Conference_Call.pdf> (page 16)

## 2025-02-11 · ALWT limited series production: Pending

- Said: ALWT, we will start getting some limited series production by Q3 or Q4 of next financial year.
- Due: Q4 FY26
- Verdict: Pending
- Filing: <https://nsearchives.nseindia.com/corporate/APOLLO_11022025212858_AMS_SE_Transcript_of_the_Q3_Earnings_Conference_Call.pdf>

## 2025-02-11 · Promoter pledge reduction to zero: Pending

- Said: In next 1 year, on a phase by phase basis. That's what we are working towards.
- Due: 2026-02-08
- Verdict: Pending
- Filing: <https://nsearchives.nseindia.com/corporate/APOLLO_11022025212858_AMS_SE_Transcript_of_the_Q3_Earnings_Conference_Call.pdf>

## 2025-02-11 · R&D investment in product development: Pending

- Said: Next year probably we may be investing close to INR100 crores on R&D in new product development actually.
- Due: FY26
- Verdict: Pending
- Filing: <https://nsearchives.nseindia.com/corporate/APOLLO_11022025212858_AMS_SE_Transcript_of_the_Q3_Earnings_Conference_Call.pdf>

## 2025-02-11 · Unit 3 IPiDS facility completion: Pending

- Said: we commenced construction of our integrated plan for Ingenious Defense System IPiDS, which is Unit 3, and this is expected to be completed by Q2 FY '26.
- Due: Q2 FY26
- Verdict: Pending
- Filing: <https://nsearchives.nseindia.com/corporate/APOLLO_11022025212858_AMS_SE_Transcript_of_the_Q3_Earnings_Conference_Call.pdf>

## Achieve 30% margins on a balance sheet basis within 1-1.5 years.: Missed

- Said: Achieve 30% margins on a balance sheet basis within 1-1.5 years.
- By: Krishna Sai Kumar, Q3 FY25 earnings call
- Verdict: Missed
- Evidence: Operating margins ran 23–24% through FY26 and 21.4% in the June 2026 quarter — the 1–1.5 year window given in Feb 2025 has closed with the target about 8 points away.

## Close all pledge parts within six months.: Unverifiable

- Said: Close all pledge parts within six months.
- By: Management, Q2 FY26 earnings call
- Verdict: Unverifiable
- Evidence: The provided financial data does not include shareholding or pledging disclosures, preventing verification of this corporate action.
- Filing: <https://nsearchives.nseindia.com/corporate/APOLLO_08112025114726_AMS_SE_Transcript_of_the_Q2_Earnings_Conference_Call-Signed.pdf> (page 9)

## Consolidate IDL Explosives Ltd. financial results starting Q2 FY '26.: Kept

- Said: Consolidate IDL Explosives Ltd. financial results starting Q2 FY '26.
- By: Addepalli Sai Kumar, Q4 FY25 earnings call
- Verdict: Kept
- Evidence: Sales jumped from ₹134 cr in the June 2025 quarter to ₹225 cr in the September quarter — consistent with IDL entering the accounts from Q2 FY26 as stated.

## Reduce working capital cycle by 100-120 days from FY '27 onwards.: Pending

- Said: Reduce working capital cycle by 100-120 days from FY '27 onwards.
- By: Addepalli Sai Kumar, Q4 FY25 earnings call
- Due: from FY '27
- Verdict: Pending
- Evidence: This target applies to FY '27, which is currently ongoing; data is insufficient to confirm the reduction in cycle days.

## Revenue growth at a CAGR of 45% to 50% over FY26 and FY27.: Pending

- Said: Revenue growth at a CAGR of 45% to 50% over FY26 and FY27.
- By: Management, Q2 FY26 earnings call
- Verdict: Pending
- Evidence: Revenue for FY26 was 1024.36 cr; the growth trajectory remains subject to performance in the remaining FY27 quarters.
- Filing: <https://nsearchives.nseindia.com/corporate/APOLLO_08112025114726_AMS_SE_Transcript_of_the_Q2_Earnings_Conference_Call-Signed.pdf> (page 4)

## Target 15% PAT percentage on a standalone basis.: Pending

- Said: Target 15% PAT percentage on a standalone basis.
- By: Sai Kumar, Q3 FY26 earnings call
- Verdict: Pending
- Evidence: Not due yet, so it can't be checked.

## Triple the order book by March '26.: Unverifiable

- Said: Triple the order book by March '26.
- By: Baddam K. Reddy, Q4 FY25 earnings call
- Verdict: Unverifiable
- Evidence: The company does not disclose total order book value in the provided financial results, making it impossible to verify the tripling claim.

## Unit-2 to commence manufacturing operations from Q2 of this financial year (FY26).: Unverifiable

- Said: Unit-2 to commence manufacturing operations from Q2 of this financial year (FY26).
- By: Addepalli Sai Kumar, Q4 FY25 earnings call
- Due: FY26
- Verdict: Unverifiable
- Evidence: The sales jump is consistent with it, but a jump alone cannot prove which unit produced it.