type: "Promise Ledger"
title: "Dalmia Bharat Ltd: what management promised, and what happened"
description: "38 statements by Dalmia Bharat Ltd's management, each checked against the company's later filings: 2 kept, 4 slipped, 2 missed, 22 pending, 8 unverifiable."
resource: "https://eqdoc.com/stock/DALBHARAT"
tags: ["promise ledger","management guidance","india","dalbharat"]
sources: [{"resource":"https://eqdoc.com/pdf/ann/7447705.pdf"},{"resource":"https://eqdoc.com/pdf/ann/7438753.pdf"},{"resource":"https://nsearchives.nseindia.com/corporate/DALBHARAT_28072026172903_DBLTranscriptJuly2026.pdf"},{"resource":"https://nsearchives.nseindia.com/corporate/DALBHARAT_24072026134643_DBL_Investor_Presentation_24072026.pdf"},{"resource":"https://nsearchives.nseindia.com/corporate/DALBHARAT_01052026121515_dblseTranscript2026may.pdf"},{"resource":"https://nsearchives.nseindia.com/corporate/DALBHARAT_22102025171930_DBLtranscriptOCT2025_signed.pdf"},{"resource":"https://nsearchives.nseindia.com/corporate/DALBHARAT_25072025142524_DBLTranscriptQ125072025.pdf"},{"resource":"https://nsearchives.nseindia.com/corporate/DALBHARAT_26042025132404_DBL_Intimation_Transcript_26042025.pdf"},{"resource":"https://nsearchives.nseindia.com/corporate/DALBHARAT_30012024211153_Transcriptjanuary2024.pdf"}]
generated: {"by":"process:eqdoc-promise-audit","at":"2026-10-07"}
stale_after: "2027-01-15"
x-eqdoc-symbol: "DALBHARAT"
x-eqdoc-counts: {"kept":2,"slipped":4,"missed":2,"pending":22,"unverifiable":8}
---

# How to read this

Each entry is something management said it would do, when it said it, and whether the company's later filings show it happened.
- **Kept**: a later filing shows it done. **Slipped**: done late or in part. **Missed**: the deadline passed without it.
- **Pending**: the deadline has not come, or no later filing yet speaks to it. **Unverifiable**: no filing could settle it.
- Evidence is either a sentence built from figures the company filed, or a quote from a later company document, as marked.

# Promises

## 2026-10-26 · Acquired Central India assets will achieve 35% to 40% capacity utilization by the end of FY27.: Pending

- Said: While Q2 saw some initial teething issues as we continue to build on network and stabilize plant operations, I'm confident that we are on track to achieve a 35% to 40% utilization
- By: Puneet Dalmia, Q2 FY27 earnings call
- Due: by end of financial year '27
- Verdict: Pending
- Evidence: Not due until 31 Mar 2027, after the latest results; later ones will show.
- Filing: <https://eqdoc.com/pdf/ann/7447705.pdf> (page 4)

## 2026-10-26 · Add 17.2 MnTPA of cement capacity between 2026 and 2028.: Pending

- Said: +17.2 MnTPA
- By: Company presentation, Investor presentation, 26 Oct 2026
- Due: 2026-2028
- Verdict: Pending
- Evidence: Not due until 31 Dec 2026, after the latest results; later ones will show.
- Filing: <https://eqdoc.com/pdf/ann/7438753.pdf> (page 11)

## 2026-10-26 · Commission further renewable energy capacity over upcoming quarters.: Pending

- Said: Further RE capacity is in pipeline for commissioning over the next few quarters
- By: Company presentation, Investor presentation, 26 Oct 2026
- Due: over the next few quarters
- Verdict: Pending
- Evidence: Not due yet, so it can't be checked.
- Filing: <https://eqdoc.com/pdf/ann/7438753.pdf> (page 32)

## 2026-10-26 · Commission the Kadapa Integrated Unit in the revised window of Q3 to Q4 FY28.: Pending

- Said: (Expected commissioning: Q3~Q4 FY28)
- By: Company presentation, Investor presentation, 26 Oct 2026
- Due: Q3~Q4 FY28
- Verdict: Pending
- Evidence: Not due until 31 Mar 2028, after the latest results; later ones will show.
- Filing: <https://eqdoc.com/pdf/ann/7438753.pdf> (page 19)

## 2026-10-26 · Incur project capital expenditure of approximately Rs. 2,200 crore in FY27.: Pending

- Said: Project Capex: ~2.2k Cr in FY27e
- By: Company presentation, Investor presentation, 26 Oct 2026
- Due: FY27e
- Verdict: Pending
- Evidence: Not due until 31 Mar 2027, after the latest results; later ones will show.
- Filing: <https://eqdoc.com/pdf/ann/7438753.pdf> (page 17)

## 2026-10-26 · Navin Tewari will transition to key adviser to the MD & CEO effective 1st January 2027.: Pending

- Said: In that spirit, in a planned transition, effective 1st January 2027, Navin Tewari, our Chief Marketing Officer, will transition as a key adviser to me on strategic initiatives and projects.
- By: Puneet Dalmia, Q2 FY27 earnings call
- Due: 1st January 2027
- Verdict: Pending
- Evidence: Not due until 31 Jan 2027, after the latest results; later ones will show.
- Filing: <https://eqdoc.com/pdf/ann/7447705.pdf> (page 5)

## 2026-07-24 · Belgaum expansion project will commence commercial production within six months of July 2026.: Unverifiable

- Said: Our Belgaum expansion project is also progressing ahead of schedule and is expected to commission -- commence commercial production in the next 6 months.
- By: Dharmender Tuteja, Q1 FY27 earnings call
- Due: in the next 6 months
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.
- Filing: <https://nsearchives.nseindia.com/corporate/DALBHARAT_28072026172903_DBLTranscriptJuly2026.pdf> (page 7)

## 2026-07-24 · Commission the 3 MnTPA bulk terminal at Chennai around Q3 FY28.: Pending

- Said: Chennai BT, Tamil Nadu ▪ Area grading work started ▪ Likely commissioning : ~Q3 FY28
- By: Company presentation, Investor presentation, 24 Jul 2026
- Due: ~Q3 FY28
- Verdict: Pending
- Evidence: Not due until 31 Dec 2027, after the latest results; later ones will show.
- Filing: <https://nsearchives.nseindia.com/corporate/DALBHARAT_24072026134643_DBL_Investor_Presentation_24072026.pdf> (page 20)

## 2026-07-24 · Commission the Belgaum integrated unit around Q4 FY27.: Pending

- Said: Belgaum IU, Karnataka ▪ 78% erection completed ▪ E&I and refractory work in full swing ▪ Likely commissioning : ~Q4 FY27
- By: Company presentation, Investor presentation, 24 Jul 2026
- Due: ~Q4 FY27
- Verdict: Pending
- Evidence: Not due until 31 Mar 2027, after the latest results; later ones will show.
- Filing: <https://nsearchives.nseindia.com/corporate/DALBHARAT_24072026134643_DBL_Investor_Presentation_24072026.pdf> (page 20)

## 2026-07-24 · Commission the Kadapa integrated unit around Q3 FY28.: Pending

- Said: Kadapa IU, Andhra Pradesh ▪ Site excavation started ▪ Civil & Mechanical contractors mobilized ▪ Likely commissioning : ~Q3 FY28
- By: Company presentation, Investor presentation, 24 Jul 2026
- Due: ~Q3 FY28
- Verdict: Pending
- Evidence: Not due until 31 Dec 2027, after the latest results; later ones will show.
- Filing: <https://nsearchives.nseindia.com/corporate/DALBHARAT_24072026134643_DBL_Investor_Presentation_24072026.pdf> (page 20)

## 2026-07-24 · Commission the Pune grinding unit around Q2 FY28.: Pending

- Said: Pune GU, Maharashtra ▪ Site excavation started ▪ Civil & Mechanical contractors mobilized ▪ Likely commissioning : ~Q2 FY28
- By: Company presentation, Investor presentation, 24 Jul 2026
- Due: ~Q2 FY28
- Verdict: Pending
- Evidence: Not due until 30 Sep 2027, after the latest results; later ones will show.
- Filing: <https://nsearchives.nseindia.com/corporate/DALBHARAT_24072026134643_DBL_Investor_Presentation_24072026.pdf> (page 20)

## 2026-04-28 · Total capex outlook for FY27 will be between INR 3,200 and INR 3,400 crores.: Pending

- Said: we expect expansion linked cash outflow in FY27 to be in the range of INR2,200 crores, with a total capex outlook for FY27 being INR3,200 to INR3,400 crores.
- By: Dharmender Tuteja, Q4 FY26 earnings call
- Due: FY27
- Verdict: Pending
- Evidence: Not due until 31 Mar 2027, after the latest results; later ones will show.
- Filing: <https://nsearchives.nseindia.com/corporate/DALBHARAT_01052026121515_dblseTranscript2026may.pdf> (page 5)

## 2026-05-01 · Kadapa project commissioning: Pending

- Said: we are confident that we will be able to commission this project somewhere between Q2 to Q3 of FY28.
- Due: Q3 FY28
- Verdict: Pending
- Filing: <https://nsearchives.nseindia.com/corporate/DALBHARAT_01052026121515_dblseTranscript2026may.pdf>

## 2026-05-01 · Q1 cost inflation impact: Pending

- Said: Overall, if you were to see versus Q4 to Q1, we are expecting an impact of somewhere between INR125 to INR150 per ton.
- Due: Q1 FY27
- Verdict: Pending
- Filing: <https://nsearchives.nseindia.com/corporate/DALBHARAT_01052026121515_dblseTranscript2026may.pdf>

## 2026-05-01 · capacity milestone target: Pending

- Said: our first milestone is, by financial year '28, we want to reach 75.
- Due: FY28
- Verdict: Pending
- Filing: <https://nsearchives.nseindia.com/corporate/DALBHARAT_01052026121515_dblseTranscript2026may.pdf>

## 2026-05-01 · cement capacity expansion target: Pending

- Said: Our ongoing expansion projects at Belgaum and Pune, as well as Kadapa, will take our cement capacity to 61.5 million tons per annum in the next 18 to 20 months.
- Due: FY28
- Verdict: Pending
- Filing: <https://nsearchives.nseindia.com/corporate/DALBHARAT_01052026121515_dblseTranscript2026may.pdf>

## 2026-05-01 · renewable energy capacity expansion: Pending

- Said: We will also be commissioning 128 megawatts of RE capacity soon, which will take us to 576-megawatt renewable energy capacity.
- Verdict: Pending
- Filing: <https://nsearchives.nseindia.com/corporate/DALBHARAT_01052026121515_dblseTranscript2026may.pdf>

## 2025-10-17 · Operational renewable energy capacity will scale to 576 MW by the end of FY26.: Unverifiable

- Said: And we are on track to scale our operational renewable capacity to 576 Megawatt by end of Financial Year '26.
- By: Dharmender Tuteja, Q2 FY26 earnings call
- Due: by end of Financial Year '26
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.
- Filing: <https://nsearchives.nseindia.com/corporate/DALBHARAT_22102025171930_DBLtranscriptOCT2025_signed.pdf> (page 5)

## 2025-07-23 · Commercial production at the Umrangso clinker unit will commence in Q3 FY26.: Unverifiable

- Said: Our clinker unit at Umrangso is nearing completion, and we plan to start trial runs in September this year. With this, the commercial production should start in Q3 of FY '26.
- By: Dharmender Tuteja, Q1 FY26 earnings call
- Due: Q3 of FY '26
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.
- Filing: <https://nsearchives.nseindia.com/corporate/DALBHARAT_25072025142524_DBLTranscriptQ125072025.pdf> (page 7)

## 2025-07-23 · FY26 capex spending will be approximately INR 4,000 crores.: Slipped

- Said: For the full year FY '26, we expect our capex spending to be about INR4,000 crores.
- By: Dharmender Tuteja, Q1 FY26 earnings call
- Due: full year FY '26
- Verdict: Slipped
- Evidence: The Q3 FY26 call, 21 Jan 2026 settles it: “We expect the spending to be around Rs. 2,700 crores in FY26.”
- Filing: <https://nsearchives.nseindia.com/corporate/DALBHARAT_25072025142524_DBLTranscriptQ125072025.pdf> (page 7)

## 2025-07-23 · Total cement capacity will reach around 63.5 million to 64 million tons per annum by FY28.: Pending

- Said: this would take our total cement capacity to around 63.5 million to 64 million tons per annum by financial year '28.
- By: Puneet Dalmia, Q1 FY26 earnings call
- Due: by financial year '28
- Verdict: Pending
- Evidence: Not due until 31 Mar 2028, after the latest results; later ones will show.
- Filing: <https://nsearchives.nseindia.com/corporate/DALBHARAT_25072025142524_DBLTranscriptQ125072025.pdf> (page 4)

## 2025-04-26 · Belgaum and Pune capacity expansion commissioning: Pending

- Said: capacity expansion of 3 million tons per annum at our existing plant in Belgaum, Karnataka along with a new greenfield 3 million ton per annum grinding unit in Pune, Maharashtra which is expected to be
- Due: FY27
- Verdict: Pending
- Filing: <https://nsearchives.nseindia.com/corporate/DALBHARAT_26042025132404_DBL_Intimation_Transcript_26042025.pdf>

## 2025-04-26 · FY26 capital expenditure target: Pending

- Said: We expect FY26 CAPEX to be about Rs. 3,500 crores
- Due: FY26
- Verdict: Pending
- Filing: <https://nsearchives.nseindia.com/corporate/DALBHARAT_26042025132404_DBL_Intimation_Transcript_26042025.pdf>

## 2025-04-26 · Operational RE capacity addition: Missed

- Said: We expect to reach 595 megawatts of operational RE capacity by end of FY26.
- Due: FY26
- Verdict: Missed
- Later filing says (2026-05-01): We continue to scale up our renewable power capacity at a strong pace, adding around 180 megawatt this year. We will also be commissioning 128 megawatts of RE capacity soon, which will take us to 576-
- Filing: <https://nsearchives.nseindia.com/corporate/DALBHARAT_26042025132404_DBL_Intimation_Transcript_26042025.pdf>

## 2025-04-26 · Realization of cost efficiency gains: Pending

- Said: During the current year we should be able to realize around half of the above efficiency gains.
- Due: FY26
- Verdict: Pending
- Filing: <https://nsearchives.nseindia.com/corporate/DALBHARAT_26042025132404_DBL_Intimation_Transcript_26042025.pdf>

## 2025-04-26 · Umrangso clinker unit commissioning: Slipped

- Said: The clinker unit at Umrangso is also near completion and expected to commission in Quarter 2 of FY26.
- Due: Q2 FY26
- Verdict: Slipped
- Later filing says (2026-01-23): I am happy to share that we have started commercial production from the new clinker line at Umrangso in Assam with a capacity of 3.6 million tons of clinker per annum.
- Filing: <https://nsearchives.nseindia.com/corporate/DALBHARAT_26042025132404_DBL_Intimation_Transcript_26042025.pdf>

## 2025-04-24 · The company projects a capital expenditure of Rs. 3,500 crores for FY26.: Slipped

- Said: We expect FY26 CAPEX to be about Rs. 3,500 crores which will largely be spent on expansion at Belgaum and Pune, clinker line at Umrangso
- By: Dharmender Tuteja, Q4 FY25 earnings call
- Due: for FY26
- Verdict: Slipped
- Evidence: The Q3 FY26 call, 21 Jan 2026 settles it: “We expect the spending to be around Rs. 2,700 crores in FY26.”

## 2025-01-22 · The company expects full-year depreciation to be between INR1,330 crores and INR1,340 crores for FY25.: Unverifiable

- Said: Full year depreciation for the current year is expected to be around INR1,330 crores to INR1,340 crores.
- By: Dharmender Tuteja, Q3 FY25 earnings call
- Due: for FY25
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.

## 2025-01-22 · The company expects to commission its clinker unit in the Northeast in the second quarter of FY26.: Unverifiable

- Said: Our clinker unit in Northeast is also in advanced stage, and we expect it to commission in Q2 of FY '26.
- By: Dharmender Tuteja, Q3 FY25 earnings call
- Due: 2026-03-31
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.

## 2025-01-22 · The company expects to have a total operational renewable energy capacity of 267 megawatts by the end of FY25.: Unverifiable

- Said: By end of FY '25, we should have total operational RE capacity of 267 megawatts
- By: Dharmender Tuteja, Q3 FY25 earnings call
- Due: by the end of FY25
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.

## 2024-10-21 · The company expects to reach a capacity of 49.5 million tons by the end of FY25.: Unverifiable

- Said: we are currently at 46.6 million tons and on track to reach 49.5 million tons by the end of financial year '25.
- By: Puneet Dalmia, Q2 FY25 earnings call
- Due: by the end of FY25
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.

## 2024-10-21 · The company expects to spend between INR3,000 and INR3,300 crores on capital expenditure for the full year FY25.: Unverifiable

- Said: During the full year, we expect to spend about INR3,000 crores to INR3,300 crores
- By: Dharmender Tuteja, Q2 FY25 earnings call
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.

## 2024-01-30 · Cement capacity addition: Missed

- Said: We will complete 46.6 million tons by this March.
- Due: 2024-03-31
- Verdict: Missed
- Later filing says (2024-05-01): During the year, financial year '24, we have added 6 million tons of cement capacity and reached closing capacity of 44.6 million tons.
- Filing: <https://nsearchives.nseindia.com/corporate/DALBHARAT_30012024211153_Transcriptjanuary2024.pdf>

## 2024-01-30 · FY24 incentive accruals estimate: Kept

- Said: For FY'24, we expect the total incentive accruals to be around INR280 crores to INR300 crores.
- Due: FY24
- Verdict: Kept
- Later filing says (2024-05-01): Accruals were about Dalmia Bharat Limited. INR298 crores, while collection has been INR314 crores with closing outstanding of INR701 crores.
- Filing: <https://nsearchives.nseindia.com/corporate/DALBHARAT_30012024211153_Transcriptjanuary2024.pdf>

## 2024-01-30 · Interim cement capacity milestone: Pending

- Said: interim milestone of 75 million tons by FY27.
- Due: FY27
- Verdict: Pending
- Filing: <https://nsearchives.nseindia.com/corporate/DALBHARAT_30012024211153_Transcriptjanuary2024.pdf>

## 2024-01-30 · Kadapa and Ariyalur expansions completion: Slipped

- Said: Our expansion at Kadapa and Ariyalur for 1 million tons each are also progressing well and will be completed by March '24.
- Due: 2024-03-31
- Verdict: Slipped
- Later filing says (2024-05-01): Our planned capacity expansion at Kadapa and Ariyalur for 1 million ton, each is under trial run and will be commissioned in the current quarter.
- Filing: <https://nsearchives.nseindia.com/corporate/DALBHARAT_30012024211153_Transcriptjanuary2024.pdf>

## 2024-01-30 · Kalyanpur and Lanka capacity commissioning: Kept

- Said: 0.5 million tons in Kalyanpur and 2.4 million tons in Lanka, Northeast, which are expected to be commissioned in the second half of FY'25.
- Due: H2 FY25
- Verdict: Kept
- Later filing says (2025-04-26): we have commissioned a Phase I of expansion milestone of 49.5 million tons per annum with the commissioning of 2.4 million tons per annum grinding unit at Lanka, Assam and 0.5 million tons grinding unit in
- Filing: <https://nsearchives.nseindia.com/corporate/DALBHARAT_30012024211153_Transcriptjanuary2024.pdf>

## 2024-01-30 · Long term cement capacity target: Pending

- Said: we remain committed to our plan of 110 million to 130 million tons by 2031
- Due: 2031
- Verdict: Pending
- Filing: <https://nsearchives.nseindia.com/corporate/DALBHARAT_30012024211153_Transcriptjanuary2024.pdf>

Live record: https://eqdoc.com/stock/DALBHARAT. Not investment advice.