type: "Promise Ledger"
title: "Emmvee Photovoltaic Power Ltd: what management promised, and what happened"
description: "30 statements by Emmvee Photovoltaic Power Ltd's management, each checked against the company's later filings: 3 kept, 24 pending, 3 unverifiable."
resource: "https://eqdoc.com/stock/EMMVEE"
tags: ["promise ledger","management guidance","india","emmvee"]
sources: [{"resource":"https://eqdoc.com/pdf/ann/7423088.pdf"},{"resource":"https://eqdoc.com/pdf/ann/7394768.pdf"},{"resource":"https://nsearchives.nseindia.com/corporate/EMMVEE_22072026184812_Emmvee-Transcript_Q1FY27_Final.pdf"},{"resource":"https://nsearchives.nseindia.com/corporate/EMMVEE_15072026200022_EPPL_Investor_PresentationQ1FY27.pdf"},{"resource":"https://eqdoc.com/pdf/ann/7046671.pdf"},{"resource":"https://nsearchives.nseindia.com/corporate/EMMVEE_05052026170211_Emmvee-Transcript-Q4FY26_Final.pdf"},{"resource":"https://nsearchives.nseindia.com/corporate/EMMVEE_20012026191230_Emmvee_Q3FY26_Conference_Call_Transcript.pdf"},{"resource":"https://nsearchives.nseindia.com/corporate/EMMVEE_08122025200413_Emmvee_Earnings_Call_Q2FY26_Transcript_signed.pdf"},{"resource":"https://nsearchives.nseindia.com/corporate/EMMVEE_02122025144400_EPPL_Letter_with_Investor_Presentation.pdf"}]
generated: {"by":"process:eqdoc-promise-audit","at":"2026-10-10"}
stale_after: "2027-01-18"
x-eqdoc-symbol: "EMMVEE"
x-eqdoc-counts: {"kept":3,"slipped":0,"missed":0,"pending":24,"unverifiable":3}
---

# How to read this

Each entry is something management said it would do, when it said it, and whether the company's later filings show it happened.
- **Kept**: a later filing shows it done. **Slipped**: done late or in part. **Missed**: the deadline passed without it.
- **Pending**: the deadline has not come, or no later filing yet speaks to it. **Unverifiable**: no filing could settle it.
- Evidence is either a sentence built from figures the company filed, or a quote from a later company document, as marked.

# Promises

## 2026-10-15 · Achieve the upper end of the INR 2,200 to 2,400 crore full-year FY27 EBITDA guidance.: Pending

- Said: I think considering the first two quarters of half-yearly projection that we have of INR1,100 crores, we can definitely achieve the upper part of the guidance.
- By: Suhas Donthi Manjunatha, Q2 FY27 earnings call
- Due: FY27
- Verdict: Pending
- Evidence: Not due until 31 Mar 2027, after the latest results; later ones will show.
- Filing: <https://eqdoc.com/pdf/ann/7423088.pdf> (page 9)

## 2026-10-14 · Commission the module line by December 2026 and the cell line by March 2027.: Pending

- Said: Module line is expected to be commissioned by December 2026, with the cell line expected by March 2027.
- By: Company presentation, Investor presentation, 14 Oct 2026
- Due: December 2026 and March 2027
- Verdict: Pending
- Evidence: Not due until 31 Dec 2026, after the latest results; later ones will show.
- Filing: <https://eqdoc.com/pdf/ann/7394768.pdf> (page 9)

## 2026-10-14 · Expand total capacity to approximately 16.3 GW of modules and 8.9 GW of cells by early FY28.: Pending

- Said: 6 GW integrated TOPCon cell and module expansion, which will increase total capacity to approximately 16.3 GW of modules and 8.9 GW of cells by early FY28
- By: Company presentation, Investor presentation, 14 Oct 2026
- Due: early FY28
- Verdict: Pending
- Evidence: Not due until 31 Mar 2028, after the latest results; later ones will show.
- Filing: <https://eqdoc.com/pdf/ann/7394768.pdf> (page 9)

## 2026-10-14 · Fund the estimated ₹5,000-5,500 crore ingot and wafer facility capex largely through internal accruals.: Pending

- Said: Estimated capex is ₹5,000-5,500 crore, broadly implying ₹600-650 crore per GW. To be funded largely through internal accruals
- By: Company presentation, Investor presentation, 14 Oct 2026
- Verdict: Pending
- Evidence: Not due yet, so it can't be checked.
- Filing: <https://eqdoc.com/pdf/ann/7394768.pdf> (page 9)

## 2026-10-14 · Roll out a 9 GW backward-integrated ingot and wafer facility in two phases across FY29 and FY30.: Pending

- Said: Rollout to be in 2 phases: 5 GW in FY29 and 4 GW in FY30, subject to final clarity on ALMM III timelines and market conditions
- By: Company presentation, Investor presentation, 14 Oct 2026
- Due: FY29 and FY30
- Verdict: Pending
- Evidence: Not due until 31 Mar 2029, after the latest results; later ones will show.
- Filing: <https://eqdoc.com/pdf/ann/7394768.pdf> (page 9)

## 2026-07-16 · Commission the 6 GW module line by December 2026 and the cell line by March 2027.: Pending

- Said: The module line is expected to be commissioned by December 2026, followed by the cell line by March 2027.
- By: Suhas Donthi Manjunatha, Q1 FY27 earnings call
- Due: by March 2027
- Verdict: Pending
- Evidence: Not due until 31 Dec 2026, after the latest results; later ones will show.
- Filing: <https://nsearchives.nseindia.com/corporate/EMMVEE_22072026184812_Emmvee-Transcript_Q1FY27_Final.pdf> (page 5)

## 2026-07-16 · Commission the backward integration wafer and ingot facility by mid-calendar year 2028.: Pending

- Said: There's no procedural steps, rather like the timing that we have planned the commissioning is by mid of calendar year 2028.
- By: Suhas Donthi Manjunatha, Q1 FY27 earnings call
- Due: by mid of calendar year 2028
- Verdict: Pending
- Evidence: Not due until 31 Dec 2028, after the latest results; later ones will show.
- Filing: <https://nsearchives.nseindia.com/corporate/EMMVEE_22072026184812_Emmvee-Transcript_Q1FY27_Final.pdf> (page 6)

## 2026-07-16 · Execute over 7 GW of order book within the next 18 months.: Pending

- Said: So, with that, we are looking at approximately 7 plus gigawatt of orders that are to be executed in the next 18-months’ time frame.
- By: Suhas Donthi Manjunatha, Q1 FY27 earnings call
- Due: in the next 18-months’ time frame
- Verdict: Pending
- Evidence: Not due until 31 Jan 2028, after the latest results; later ones will show.
- Filing: <https://nsearchives.nseindia.com/corporate/EMMVEE_22072026184812_Emmvee-Transcript_Q1FY27_Final.pdf> (page 6)

## 2026-07-16 · Target approximately INR 2,400 crore of EBITDA by the close of FY27.: Pending

- Said: We are targeting approximately INR 2,400 crore of an EBITDA by the close of FY27.
- By: Suhas Donthi Manjunatha, Q1 FY27 earnings call
- Due: by the close of FY27
- Verdict: Pending
- Evidence: Not due until 31 Mar 2027, after the latest results; later ones will show.
- Filing: <https://nsearchives.nseindia.com/corporate/EMMVEE_22072026184812_Emmvee-Transcript_Q1FY27_Final.pdf> (page 11)

## 2026-07-15 · Commission 6.00 GW of modules and 6.00 GW of cells at Unit 7 during 2026-2027.: Pending

- Said: Unit 7 2026-2027 ~25,00,000 6.00 | 6.00 Modules | Cell TOPCon
- By: Company presentation, Investor presentation, 15 Jul 2026
- Due: 2026-2027
- Verdict: Pending
- Evidence: Not due until 31 Mar 2027, after the latest results; later ones will show.
- Filing: <https://nsearchives.nseindia.com/corporate/EMMVEE_15072026200022_EPPL_Investor_PresentationQ1FY27.pdf> (page 15)

## 2026-07-15 · Complete the 6 GW integrated facility project within an estimated cost of ₹5,500 crore.: Pending

- Said: The project cost is estimated at about ₹5,500 crore, with hard costs of about ₹4,600 crore. Debt of approximately ₹3,300 crore has been tied up at a sub-8% cost.
- By: Company presentation, Investor presentation, 15 Jul 2026
- Verdict: Pending
- Evidence: Not due yet, so it can't be checked.
- Filing: <https://eqdoc.com/pdf/ann/7046671.pdf> (page 9)

## 2026-07-15 · Expect domestic content requirement demand to strengthen through FY27.: Pending

- Said: Expect DCR demand to strengthen through FY27 as grandfathered non-DCR projects roll-off and ALMM-led procurement becomes more broad-based.
- By: Company presentation, Investor presentation, 15 Jul 2026
- Due: through FY27
- Verdict: Pending
- Evidence: Not due until 31 Mar 2027, after the latest results; later ones will show.
- Filing: <https://nsearchives.nseindia.com/corporate/EMMVEE_15072026200022_EPPL_Investor_PresentationQ1FY27.pdf> (page 9)

## 2026-07-15 · Reach 8.94 GW in TOPCon cell capacity by H1 FY28 post-expansion.: Pending

- Said: TOPCon Cell Capacity To Reach 8.94 GW By H1 FY’28 (Post Expansion)
- By: Company presentation, Investor presentation, 15 Jul 2026
- Due: H1 FY'28
- Verdict: Pending
- Evidence: Not due until 31 Mar 2028, after the latest results; later ones will show.
- Filing: <https://eqdoc.com/pdf/ann/7046671.pdf> (page 18)

## 2026-07-15 · Cell line commissioning timeline: Pending

- Said: with the cell line expected by March 2027. Commercial Sales to be aligned with the commissioning dates, with utilisations scaling steadily.
- Due: 2027-03-31
- Verdict: Pending
- Filing: <https://nsearchives.nseindia.com/corporate/EMMVEE_15072026200022_EPPL_Investor_PresentationQ1FY27.pdf>

## 2026-07-15 · Commissioning of module and cell lines: Pending

- Said: Module line is expected to be commissioned by December 2026, with the cell line expected by March 2027.
- Due: 2026-12-31
- Verdict: Pending
- Filing: <https://nsearchives.nseindia.com/corporate/EMMVEE_15072026200022_EPPL_Investor_PresentationQ1FY27.pdf>

## 2026-07-15 · Ingot and wafer backward integration capex: Pending

- Said: Estimated capex is ₹5,000-5,500 crore, broadly implying ₹600-650 crore per GW. To be funded largely through internal accruals.
- Due: FY2030
- Verdict: Pending
- Filing: <https://nsearchives.nseindia.com/corporate/EMMVEE_15072026200022_EPPL_Investor_PresentationQ1FY27.pdf>

## 2026-07-15 · Ingot and wafer facility rollout: Pending

- Said: Rollout to be in 2 phases: 5 GW in FY29 and 4 GW in FY30, subject to final clarity on ALMM III timelines and market conditions.
- Due: FY2029
- Verdict: Pending
- Filing: <https://nsearchives.nseindia.com/corporate/EMMVEE_15072026200022_EPPL_Investor_PresentationQ1FY27.pdf>

## 2026-07-15 · TOPCon cell and module capacity targets: Pending

- Said: 6 GW integrated TOPCon cell and module expansion, which will increase total capacity to approximately 16.3 GW of modules and 8.9 GW of cells by early FY28.
- Due: FY2028
- Verdict: Pending
- Filing: <https://nsearchives.nseindia.com/corporate/EMMVEE_15072026200022_EPPL_Investor_PresentationQ1FY27.pdf>

## 2026-07-15 · Target annual installed capacity expansion: Pending

- Said: FY28 Target Annual Installed Capacity Modules 16.3 GW Cells 8.9 GW
- Due: FY2028
- Verdict: Pending
- Filing: <https://nsearchives.nseindia.com/corporate/EMMVEE_15072026200022_EPPL_Investor_PresentationQ1FY27.pdf>

## 2026-04-29 · Complete the transition from M10 to G12R cells by the end of Q1 FY27.: Unverifiable

- Said: It’s only that we have an order book for M10 out that is lasting until end of March, end of May, and we, we are looking to transition in this by the end of this quarter.
- By: Suhas Donthi Manjunatha, Q4 FY26 earnings call
- Due: by the end of this quarter
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.
- Filing: <https://nsearchives.nseindia.com/corporate/EMMVEE_05052026170211_Emmvee-Transcript-Q4FY26_Final.pdf> (page 13)

## 2026-01-20 · Order book execution timeline: Pending

- Said: that is 6.3 gigawatt of order that I can execute in the next 12 to 18 months
- Verdict: Pending
- Filing: <https://nsearchives.nseindia.com/corporate/EMMVEE_20012026191230_Emmvee_Q3FY26_Conference_Call_Transcript.pdf>

## 2026-01-20 · Silver paste consumption reduction target: Pending

- Said: and we further are aiming to reduce the silver paste consumption by another 40%.
- Verdict: Pending
- Filing: <https://nsearchives.nseindia.com/corporate/EMMVEE_20012026191230_Emmvee_Q3FY26_Conference_Call_Transcript.pdf>

## 2026-01-20 · Transition to 100% TopCon modules: Kept

- Said: and in FY26 we are doing zero Monoperc, 100% TopCon.
- Due: FY26
- Verdict: Kept
- Later filing says (2026-04-28): Company’s aggregate solar module installed capacity now stands increased to 10.3 GW, marking a 100% transition to TOPCon
- Filing: <https://nsearchives.nseindia.com/corporate/EMMVEE_20012026191230_Emmvee_Q3FY26_Conference_Call_Transcript.pdf>

## 2025-12-02 · Commission the second 2.5 GW module line in FY 2026.: Unverifiable

- Said: The second 2.5 gigawatt module line will come online in FY 2026.
- By: Suhas Manjunatha, Q2 FY26 earnings call
- Due: FY 2026
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.
- Filing: <https://nsearchives.nseindia.com/corporate/EMMVEE_08122025200413_Emmvee_Earnings_Call_Q2FY26_Transcript_signed.pdf> (page 4)

## 2025-12-02 · Maintain EBITDA margins broadly around the current band of approximately 35% as volumes ramp up.: Unverifiable

- Said: As volumes ramp up further, our goal is to maintain margins broadly around the current band while staying competitive and continuing to invest in technology upgrades and backward integration.
- By: Suhas Manjunatha, Q2 FY26 earnings call
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.
- Filing: <https://nsearchives.nseindia.com/corporate/EMMVEE_08122025200413_Emmvee_Earnings_Call_Q2FY26_Transcript_signed.pdf> (page 4)

## 2025-12-02 · ITIR Phase II expansion: Pending

- Said: Process of adding a 6.00 GW solar cell and solar PV module production in ITIR Phase – II, Bengaluru
- Verdict: Pending
- Filing: <https://nsearchives.nseindia.com/corporate/EMMVEE_02122025144400_EPPL_Letter_with_Investor_Presentation.pdf>

## 2025-12-02 · Second module line operational timeline: Kept

- Said: Second module line of 2.5GW is expected to be operational in FY26
- Due: FY26
- Verdict: Kept
- Later filing says (2026-05-05): During the year, we commissioned a 2.5 gigawatt module manufacturing line in May 2025 and another 2.5 gigawatt line in December 2025 at Sulibele, Bengaluru.
- Filing: <https://nsearchives.nseindia.com/corporate/EMMVEE_02122025144400_EPPL_Letter_with_Investor_Presentation.pdf>

## 2025-12-02 · Sulibele module capacity addition: Kept

- Said: Process of adding a 2.50 GW module production capacity line in our manufacturing unit at Sulibele, which is expected to be operational in FY26
- Due: FY26
- Verdict: Kept
- Later filing says (2026-01-15): Commissioned a 2.5 GW solar module manufacturing line on 20 Dec 2025 Facility located at Sulibele, Hoskote Taluk, Bengaluru, Karnataka (Unit VI) Capacity expansion completed as planned
- Filing: <https://nsearchives.nseindia.com/corporate/EMMVEE_02122025144400_EPPL_Letter_with_Investor_Presentation.pdf>

## 2025-12-02 · TOPCon cell capacity target: Pending

- Said: TOPCon Cell Capacity To Reach 8.94 GW By H1 FY’28 (Post Expansion)
- Due: H1 FY28
- Verdict: Pending
- Filing: <https://nsearchives.nseindia.com/corporate/EMMVEE_02122025144400_EPPL_Letter_with_Investor_Presentation.pdf>

## 2025-12-02 · Wafer and ancillary manufacturing integration: Pending

- Said: Intention to focus on backward integration, with production of wafer and other ancillary components
- Verdict: Pending
- Filing: <https://nsearchives.nseindia.com/corporate/EMMVEE_02122025144400_EPPL_Letter_with_Investor_Presentation.pdf>

Live record: https://eqdoc.com/stock/EMMVEE. Not investment advice.