type: "Promise Ledger"
title: "Nuvoco Vistas Corporation Ltd: what management promised, and what happened"
description: "36 statements by Nuvoco Vistas Corporation Ltd's management, each checked against the company's later filings: 1 slipped, 2 missed, 27 pending, 6 unverifiable."
resource: "https://eqdoc.com/stock/NUVOCO"
tags: ["promise ledger","management guidance","india","nuvoco"]
sources: [{"resource":"https://eqdoc.com/pdf/ann/7453407.pdf"},{"resource":"https://eqdoc.com/pdf/ann/7429630.pdf"},{"resource":"https://nsearchives.nseindia.com/corporate/NUVOCO_20072026181213_SEIntimation_Transcript.pdf"},{"resource":"https://eqdoc.com/pdf/ann/7028563.pdf"},{"resource":"https://nsearchives.nseindia.com/corporate/NUVOCO_17042026185550_IntimationFinal.pdf"},{"resource":"https://nsearchives.nseindia.com/corporate/NUVOCO_22012026170731_Intimationoftranscriptofearningscallsigned.pdf"},{"resource":"https://nsearchives.nseindia.com/corporate/NUVOCO_22102025125650_SEIntimation_Oct22.pdf"},{"resource":"https://nsearchives.nseindia.com/corporate/NUVOCO_15102025172148_SEIntimation_InvestorPPT.pdf"},{"resource":"https://nsearchives.nseindia.com/corporate/NUVOCO_24072025162408_Intimationoftransacriptofearningscallsigned.pdf"},{"resource":"https://nsearchives.nseindia.com/corporate/NUVOCO_02022024191628_Intimation1.pdf"}]
generated: {"by":"process:eqdoc-promise-audit","at":"2026-11-08"}
stale_after: "2027-02-16"
x-eqdoc-symbol: "NUVOCO"
x-eqdoc-counts: {"kept":0,"slipped":1,"missed":2,"pending":27,"unverifiable":6}
---

# How to read this

Each entry is something management said it would do, when it said it, and whether the company's later filings show it happened.
- **Kept**: a later filing shows it done. **Slipped**: done late or in part. **Missed**: the deadline passed without it.
- **Pending**: the deadline has not come, or no later filing yet speaks to it. **Unverifiable**: no filing could settle it.
- Evidence is either a sentence built from figures the company filed, or a quote from a later company document, as marked.

# Promises

## 2026-10-23 · Operationalize Kutch jetty by the first week of December 2026.: Pending

- Said: And as we speak, we are doing the dredging of jetty in Kutch, and by first week of December, we'll have operational jetty.
- By: Jayakumar Krishnaswamy, Q2 FY27 earnings call
- Due: by first week of December
- Verdict: Pending
- Evidence: Not due until 31 Dec 2026, after the latest results; later ones will show.
- Filing: <https://eqdoc.com/pdf/ann/7453407.pdf> (page 16)

## 2026-10-22 · Commission the Grinding Unit, WHR, Railway Siding at Kutch, and Bulk Terminal at Sachana in H1 FY28.: Pending

- Said: • Grinding Unit and WHR at Kutch • Railway Siding at Kutch • Bulk Terminal at Sachana
- By: Company presentation, Investor presentation, 22 Oct 2026
- Due: H1 FY28
- Verdict: Pending
- Evidence: Not due until 31 Mar 2028, after the latest results; later ones will show.
- Filing: <https://eqdoc.com/pdf/ann/7429630.pdf> (page 10)

## 2026-10-22 · Commission the bulk terminal with dedicated railway siding at Sachana with ~1.5 MMTPA handling capacity.: Pending

- Said: Bulk terminal with dedicated railway siding at Viramgam, Sachana, Gujarat ~1.5 MMTPA handling capacity
- By: Company presentation, Investor presentation, 22 Oct 2026
- Due: FY27-28
- Verdict: Pending
- Evidence: Not due until 31 Mar 2028, after the latest results; later ones will show.
- Filing: <https://eqdoc.com/pdf/ann/7429630.pdf> (page 8)

## 2026-10-22 · Develop ~46 MW of wind-solar hybrid capacity in Rajasthan and ~14 MW of WHR capacity at Kutch Plant.: Pending

- Said: Additional wind-solar hybrid renewable energy capacity of ~46 MW at Rajasthan and ~14 MW of WHR capacity at Kutch Plant is under development,
- By: Company presentation, Investor presentation, 22 Oct 2026
- Verdict: Pending
- Evidence: Not due yet, so it can't be checked.
- Filing: <https://eqdoc.com/pdf/ann/7429630.pdf> (page 5)

## 2026-10-22 · Kutch Integrated Unit will become operational in phases between Q3 FY27 and Q1 FY28.: Pending

- Said: Kutch IU to be operational in phases from Q3 FY27 to Q1 FY28.
- By: Company presentation, Investor presentation, 22 Oct 2026
- Due: Q3 FY27 to Q1 FY28
- Verdict: Pending
- Evidence: Not due until 31 Dec 2026, after the latest results; later ones will show.
- Filing: <https://eqdoc.com/pdf/ann/7429630.pdf> (page 5)

## 2026-10-22 · Total cement capacity is expected to reach ~35 MMTPA post Vadraj Cement Limited and planned East expansion.: Pending

- Said: ~35 MMTPA capacity post Vadraj Cement Limited and planned East expansion
- By: Company presentation, Investor presentation, 22 Oct 2026
- Verdict: Pending
- Evidence: Not due yet, so it can't be checked.
- Filing: <https://eqdoc.com/pdf/ann/7429630.pdf> (page 8)

## 2026-07-20 · Arasmeta plant commissioning and availability: Pending

- Said: Arasmeta should be on by end of this fiscal '27 and will be available in Q1 FY28.
- Due: Q1 FY28
- Verdict: Pending
- Filing: <https://nsearchives.nseindia.com/corporate/NUVOCO_20072026181213_SEIntimation_Transcript.pdf>

## 2026-07-20 · East capacity expansion plan: Pending

- Said: For our East operation, we continue to progress on our plan to add 4 million tons per annum of capacity in phases till FY28.
- Due: FY28
- Verdict: Pending
- Filing: <https://nsearchives.nseindia.com/corporate/NUVOCO_20072026181213_SEIntimation_Transcript.pdf>

## 2026-07-20 · FY27 volume growth target: Pending

- Said: I think our target is to get close to about 7%-8% of market growth. So, that we would go for it with incremental volume anyway will come for us in Gujarat.
- Due: FY27
- Verdict: Pending
- Filing: <https://nsearchives.nseindia.com/corporate/NUVOCO_20072026181213_SEIntimation_Transcript.pdf>

## 2026-07-20 · Kutch unit operationalization timeline: Pending

- Said: The clinker and the grinding units at Kutch are also progressing well and remain on track for phased operationalization from Q3 FY27.
- Due: Q3 FY27
- Verdict: Pending
- Filing: <https://nsearchives.nseindia.com/corporate/NUVOCO_20072026181213_SEIntimation_Transcript.pdf>

## 2026-07-20 · Sachana bulk cement terminal operationalization: Pending

- Said: This facility is targeted to be operational by Q2 FY28 and will act as a strategic distribution hub, helping us strengthen our presence and further expand our reach across the Gujarat market.
- Due: Q2 FY28
- Verdict: Pending
- Filing: <https://nsearchives.nseindia.com/corporate/NUVOCO_20072026181213_SEIntimation_Transcript.pdf>

## 2026-07-13 · A 4 MMTPA expansion will be carried out in the East region in phases till FY28 through internal debottlenecking and upgr: Pending

- Said: In East, 4 MMTPA expansion planned in phases till FY28 through equipment upgrades, process modification and internal debottlenecking.
- By: Company presentation, Investor presentation, 13 Jul 2026
- Due: till FY28
- Verdict: Pending
- Evidence: Not due until 31 Mar 2028, after the latest results; later ones will show.
- Filing: <https://eqdoc.com/pdf/ann/7028563.pdf> (page 5)

## 2026-07-13 · Bulk Terminal at Sachana is slated for commissioning in Q2 FY28.: Pending

- Said: Commissioning timeline: Q2 FY28
- By: Company presentation, Investor presentation, 13 Jul 2026
- Due: Q2 FY28
- Verdict: Pending
- Evidence: Not due until 30 Sep 2027, after the latest results; later ones will show.
- Filing: <https://eqdoc.com/pdf/ann/7028563.pdf> (page 12)

## 2026-07-13 · Clinker Unit, Captive Power Plant, and Jetty operations at Kutch are scheduled for commissioning in H2 FY27.: Pending

- Said: H2 FY27 CU and CPP at Kutch Kutch Jetty operations
- By: Company presentation, Investor presentation, 13 Jul 2026
- Due: H2 FY27
- Verdict: Pending
- Evidence: Not due until 31 Mar 2027, after the latest results; later ones will show.
- Filing: <https://eqdoc.com/pdf/ann/7028563.pdf> (page 11)

## 2026-07-13 · Complete civil works to release fronts for Mechanical & Electrical Installation at Kutch Grinding Unit and WHR in H1 FY2: Unverifiable

- Said: H1 FY27 target: Complete civil works to release fronts for Mechanical & Electrical Installation
- By: Company presentation, Investor presentation, 13 Jul 2026
- Due: H1 FY27
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.
- Filing: <https://eqdoc.com/pdf/ann/7028563.pdf> (page 11)

## 2026-07-13 · Complete overhauling of all major equipment and initiate trial preparation for Kutch Clinker Unit in H1 FY27.: Unverifiable

- Said: H1 FY27 target: Complete overhauling of all major equipment and initiate trial preparation
- By: Company presentation, Investor presentation, 13 Jul 2026
- Due: H1 FY27
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.
- Filing: <https://eqdoc.com/pdf/ann/7028563.pdf> (page 11)

## 2026-04-15 · FY27 capex guided at INR 900 crores and FY28 capex at INR 960 crores.: Pending

- Said: '27 and '28 will be INR900 crores for '27 and INR960 crores for '28. That's all largely coming out of Vadraj refurbishment, INR627 crores and INR728 crores.
- By: Jayakumar Krishnaswamy, Q4 FY26 earnings call
- Due: '27 and '28
- Verdict: Pending
- Evidence: Not due until 31 Mar 2027, after the latest results; later ones will show.
- Filing: <https://nsearchives.nseindia.com/corporate/NUVOCO_17042026185550_IntimationFinal.pdf> (page 16)

## 2026-04-15 · Maintain net debt-to-EBITDA ratio between 2x and 2.5x during FY27.: Pending

- Said: However, our goal has been to maintain that debt level to 2x to 2.5x EBITDA. And there, we will meet our numbers during the fiscal FY27.
- By: Jayakumar Krishnaswamy, Q4 FY26 earnings call
- Due: during the fiscal FY27
- Verdict: Pending
- Evidence: Not due until 31 Mar 2027, after the latest results; later ones will show.
- Filing: <https://nsearchives.nseindia.com/corporate/NUVOCO_17042026185550_IntimationFinal.pdf> (page 16)

## 2026-01-16 · Complete an additional INR 600 crores CCD issuance in the near term to substitute bridge financing.: Pending

- Said: We expect to complete an additional INR 600 crores CCD issuances in the near term to substitute the remaining INR 600 crores of short-term bridge financing.
- By: Bishnu Sharma, Q3 FY26 earnings call
- Due: in the near term
- Verdict: Pending
- Evidence: Not due yet, so it can't be checked.
- Filing: <https://nsearchives.nseindia.com/corporate/NUVOCO_22012026170731_Intimationoftranscriptofearningscallsigned.pdf> (page 4)

## 2026-01-16 · Full-year FY26 capex will range between INR 620 crores and INR 670 crores.: Unverifiable

- Said: So, for the full year, the CAPEX outlook is coming anywhere between INR 620 crores to 670 crores.
- By: Jayakumar Krishnaswamy, Q3 FY26 earnings call
- Due: full year
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.
- Filing: <https://nsearchives.nseindia.com/corporate/NUVOCO_22012026170731_Intimationoftranscriptofearningscallsigned.pdf> (page 7)

## 2026-01-16 · Increase AFR usage to between 13% and 15% by Q1 FY27.: Unverifiable

- Said: So, I guess some ramp up time will take in the next three months by Q1 FY’27 we should be able to get this number to anywhere between 13%-15% at a Company level.
- By: Jayakumar Krishnaswamy, Q3 FY26 earnings call
- Due: by Q1 FY’27
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.
- Filing: <https://nsearchives.nseindia.com/corporate/NUVOCO_22012026170731_Intimationoftranscriptofearningscallsigned.pdf> (page 12)

## 2026-01-16 · Overall capex for FY27 guided at close to Rs. 1,000 crores.: Pending

- Said: Yes by FY’27 I am looking at the overall CAPEX of close to about Rs. 1,000 crores and FY’28 close to Rs. 700 crores.
- By: Jayakumar Krishnaswamy, Q3 FY26 earnings call
- Due: FY’27 and FY’28
- Verdict: Pending
- Evidence: Not due until 31 Mar 2027, after the latest results; later ones will show.
- Filing: <https://nsearchives.nseindia.com/corporate/NUVOCO_22012026170731_Intimationoftranscriptofearningscallsigned.pdf> (page 19)

## 2025-10-16 · Spend approximately Rs. 420 crores on capex in H2 FY26.: Unverifiable

- Said: overall, I am looking at in H2, CAPEX outflow of close to about 370 plus 50, Rs. 420 crores as the cash outflow.
- By: Jayakumar Krishnaswamy, Q2 FY26 earnings call
- Due: in H2
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.
- Filing: <https://nsearchives.nseindia.com/corporate/NUVOCO_22102025125650_SEIntimation_Oct22.pdf> (page 11)

## 2025-10-15 · East cement capacity expansion: Pending

- Said: ~4 MMTPA expansion in East over Dec’25 to Mar’27 through one cement mill, equipment upgrades, process modification and internal debottlenecking.
- Due: 2027-03-31
- Verdict: Pending
- Filing: <https://nsearchives.nseindia.com/corporate/NUVOCO_15102025172148_SEIntimation_InvestorPPT.pdf>

## 2025-10-15 · East expansion capex limit: Pending

- Said: Expansion to be achieved with limited investment of less than ₹ 200 Cr.
- Verdict: Pending
- Filing: <https://nsearchives.nseindia.com/corporate/NUVOCO_15102025172148_SEIntimation_InvestorPPT.pdf>

## 2025-10-15 · Vadraj cement plant operational timeline: Pending

- Said: Vadraj Cement Plant to be operational by Q3 FY27
- Due: Q3 FY27
- Verdict: Pending
- Filing: <https://nsearchives.nseindia.com/corporate/NUVOCO_15102025172148_SEIntimation_InvestorPPT.pdf>

## 2025-07-18 · Commission clinker and grinding units at Kutch and Surat in phases from Q3 FY27.: Pending

- Said: Our current plan is to make the plants at Kutch and Surat and associated equipment including the jetty ready for trial runs by H1 FY'27 with full functioning targeted for Q3 FY'27.
- By: Madhumita Basu, Q1 FY26 earnings call
- Due: Q3 FY'27
- Verdict: Pending
- Evidence: Not due until 31 Dec 2026, after the latest results; later ones will show.
- Filing: <https://nsearchives.nseindia.com/corporate/NUVOCO_24072025162408_Intimationoftransacriptofearningscallsigned.pdf> (page 4)

## 2025-07-18 · Convert bridge financing into equity-like instrument within 2 to 3 months.: Unverifiable

- Said: This bridge financing is for a short-term period of maximum 2 to 3 months. And I guess, hopefully, in the coming 2 to 3 months, we should convert this debt into an equity like-type of instrument.
- By: Jayakumar Krishnaswamy, Q1 FY26 earnings call
- Due: coming 2 to 3 months
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.
- Filing: <https://nsearchives.nseindia.com/corporate/NUVOCO_24072025162408_Intimationoftransacriptofearningscallsigned.pdf> (page 7)

## 2025-05-02 · The company expects to reach a total cement capacity of 31 million tons per annum by the third quarter of FY’27.: Pending

- Said: This acquisition will enable us to reach a total cement capacity of 31 million tons per annum by the third quarter of FY’27
- By: management, Q4 FY25 earnings call
- Verdict: Pending
- Evidence: Not due yet, so it can't be checked.

## 2025-05-02 · The company plans to issue all purchase orders for the Kutch and Surat facilities within 6 to 8 weeks.: Pending

- Said: our target is in the next 6 to 8 weeks, all the purchase orders will be rolled out.
- By: management, Q4 FY25 earnings call
- Verdict: Pending
- Evidence: Not due yet, so it can't be checked.

## 2025-01-22 · The Jajpur railway siding is expected to be operational by the first quarter of fiscal year 2026.: Slipped

- Said: Come Q1 FY ’26, Jajpur should be on.
- By: management, Q3 FY25 earnings call
- Due: 2025-06-30
- Verdict: Slipped
- Evidence: The Q4 FY26 call, 15 Apr 2026 settles it: “Jajpur should happen in the next 2 to 3 months, and Arasmeta will happen by the end of this year.”

## 2024-02-02 · Cost Savings Project BRIDGE: Missed

- Said: We were looking at an order of Rs. 50 per ton savings out of the BRIDGE program rolling in over a 12-month period.
- Due: 2024-03-31
- Verdict: Missed
- Later filing says (2024-05-07): Our strategic initiative, Project Bridge 1.0 aimed at enhancing efficiency has yielded a notable reduction of Rs.30 per ton in operating costs since its implementation in Q2 FY’24.
- Filing: <https://nsearchives.nseindia.com/corporate/NUVOCO_02022024191628_Intimation1.pdf>

## 2024-02-02 · FY24 Total CAPEX Guidance: Pending

- Said: So, we will be ending about Rs. 610-Rs. 615 crores will be this year's CAPEX.
- Due: FY24
- Verdict: Pending
- Filing: <https://nsearchives.nseindia.com/corporate/NUVOCO_02022024191628_Intimation1.pdf>

## 2024-02-02 · FY25 Routine CAPEX Outlay: Pending

- Said: Here we are looking at close to about Rs. 500 odd crores as current outlay of CAPEX for next year.
- Due: FY25
- Verdict: Pending
- Filing: <https://nsearchives.nseindia.com/corporate/NUVOCO_02022024191628_Intimation1.pdf>

## 2024-02-02 · Ready-Mix Concrete Plant Expansion: Missed

- Said: and by the end of next fiscal, which is FY25, we have plans to take the business to 80 plants and then in the next two years it will go to 100 plants
- Due: FY25
- Verdict: Missed
- Later filing says (2025-10-15): Currently, 58 plants operational across India
- Filing: <https://nsearchives.nseindia.com/corporate/NUVOCO_02022024191628_Intimation1.pdf>

## 2024-02-02 · WHR Capacity Debottlenecking: Pending

- Said: We are also debottlenecking to improve the WHR capacity by another about 3-4 MW in the coming year
- Due: FY25
- Verdict: Pending
- Filing: <https://nsearchives.nseindia.com/corporate/NUVOCO_02022024191628_Intimation1.pdf>

Live record: https://eqdoc.com/stock/NUVOCO. Not investment advice.