type: "Promise Ledger"
title: "Technocraft Industries (India) Ltd: what management promised, and what happened"
description: "20 statements by Technocraft Industries (India) Ltd's management, each checked against the company's later filings: 4 kept, 1 slipped, 2 missed, 12 pending, 1 unverifiable."
resource: "https://eqdoc.com/stock/TIIL"
tags: ["promise ledger","management guidance","india","tiil"]
generated: {"by":"process:eqdoc-promise-audit","at":"2026-09-16"}
stale_after: "2026-12-25"
x-eqdoc-symbol: "TIIL"
x-eqdoc-counts: {"kept":4,"slipped":1,"missed":2,"pending":12,"unverifiable":1}
---

# How to read this

Each entry is something management said it would do, when it said it, and whether the company's later filings show it happened.
- **Kept**: a later filing shows it done. **Slipped**: done late or in part. **Missed**: the deadline passed without it.
- **Pending**: the deadline has not come, or no later filing yet speaks to it. **Unverifiable**: no filing could settle it.
- Evidence is either a sentence built from figures the company filed, or a quote from a later company document, as marked.

# Promises

## 2026-08-17 · The company aims to restructure the Garment business to achieve break-even.: Pending

- Said: So, that we are trying to restructure it and try to break even in the next 2 quarters.
- By: Navneet Kumar Saraf, Q1 FY27 earnings call
- Verdict: Pending
- Evidence: Not due yet, so it can't be checked.

## 2026-08-17 · The company expects to maintain or improve Scaffolding volumes for the next two quarters.: Pending

- Said: Yes. So, we are quite comfortable that at least the foreseeable next 2 quarters, we should be able to maintain or even better the kind of volumes
- By: Navneet Kumar Saraf, Q1 FY27 earnings call
- Verdict: Pending
- Evidence: Not due yet, so it can't be checked.

## 2026-08-13 · Drum closures capex plan: Pending

- Said: No major capex is planned for this division other than maintenance capex in near future.
- Verdict: Pending

## 2026-08-13 · Investment in AI technology: Kept

- Said: The company is seeing some challenges and disruptions due to massive AI adoption in US markets and company is also embracing this by investing heavily in these technologies
- Verdict: Kept
- Later filing says (2026-08-19): We have continuously upgraded our services, moving into more high-tech technology enabled, even deep-tech services like AI based vision systems, embedded systems, industrial automation

## 2026-08-13 · Textile market expansion strategy: Pending

- Said: Company aims to market its products in new / diverse territories including domestic market to de-risk global uncertainties.
- Verdict: Pending

## 2026-08-13 · Textile value-added product focus: Pending

- Said: Company aims to concentrate on value added products in-place of commodity which will contribute top line and bottom line positively.
- Verdict: Pending

## 2026-02-12 · The company expects the Scaffolding and Formwork segment to exceed INR2,000 crores in revenue within three years.: Pending

- Said: So I think next 3 years, we continue to be quite bullish that the Scaffolding and Formwork segment will cross revenue of INR2,000 crores.
- By: Navneet Saraf, Q3 FY26 earnings call
- Due: 2029-02-12
- Verdict: Pending
- Evidence: Not due until 12 Feb 2029, after the latest results; later ones will show.

## 2026-02-12 · The company expects to return to 15% margins in the March quarter.: Unverifiable

- Said: We'll be back to our normal 15% margins in the March quarter.
- By: Navneet Saraf, Q3 FY26 earnings call
- Due: 2026-03-31
- Verdict: Unverifiable
- Evidence: We could not match this promise to a figure, and no later call settles it.

## 2025-11-17 · ER&D quarterly revenue run rate: Kept

- Said: we are expecting to be at a quarterly revenue run rate of INR75 crores to INR80 crores per quarter by the end of Q4.
- Due: FY26-Q4
- Verdict: Kept
- Later filing says (2026-05-28): Engineering & Designing Services 7,889

## 2025-11-17 · Extrusion plant capacity expansion capex: Pending

- Said: In the next 2 years, we may be looking at doubling the capacity of our extrusion plant. So that will entail a capex of about INR150 crores or so, but that is something which is 2027, not 2026.
- Due: FY28
- Verdict: Pending

## 2025-11-17 · Formwork full year revenue target: Missed

- Said: we are actually on track with our target for about INR900 crores this year. This particular quarter, the total segment revenue was about INR402 crores
- Due: FY26
- Verdict: Missed
- Later filing says (2026-06-03): So INR1,342 crores. I think about INR680 crores or so was scaffolding and about INR660 crores or so was formwork. So almost 50-50.

## 2025-11-17 · Formwork production capacity expansion timeline: Pending

- Said: Once we double that, we will correspondingly also increase the formwork production capacity. So that will happen in either the latter half of FY '27 or first half of FY '28.
- Due: FY28-Q1
- Verdict: Pending

## 2025-05-30 · The company expects to reach 100% operational capacity by September 2025.: Slipped

- Said: We expect it to be 100% by September this year.
- By: Navneet Kumar Saraf, Q4 FY25 earnings call
- Due: 2026-03-31
- Verdict: Slipped
- Evidence: The Q1 FY26 call, 12 Aug 2025 settles it: “Our Aurangabad plant is now at about 75% capacity and should get to close to 90%, 95% in August and September.”

## 2025-02-12 · The company expects the March 2025 quarter to outperform the December 2024 quarter in both top and bottom lines.: Kept

- Said: March '25, last quarter should be definitely better both in top line and bottom line than December quarter, as is always.
- By: Navneet Saraf, Q3 FY25 earnings call
- Due: 2025-03-31
- Verdict: Kept
- Evidence: Sales went from ₹644 cr in the Dec 2024 quarter to ₹702 cr in the Mar 2025 quarter.

## 2024-08-22 · FY25 Aurangabad facility revenue addition: Pending

- Said: This year in FY '25, we will see probably, you know, about a INR60 crores increase in revenue on account of the Aurangabad facility and roughly about INR10 to INR15 crores increase in profitability.
- Due: FY25
- Verdict: Pending

## 2024-08-22 · Fabric division FY25 top line: Pending

- Said: And in fabric, we are expecting about top line of about close to INR170 crores, INR180 crores by end of this financial year.
- Due: FY25
- Verdict: Pending

## 2024-08-22 · Garment division FY25 revenue margin: Pending

- Said: And in the garment division, we are expecting also EBITDA level of about 15% with a top line of about INR110 crores, INR120 crores by end of this financial year.
- Due: FY25
- Verdict: Pending

## 2024-08-22 · Poland B certification timeline: Pending

- Said: It is called the B certification from an agency in Poland. So, Yes, we hope to be able to get that by the end of September.
- Due: 2024-09-30
- Verdict: Pending

## 2024-08-20 · The company expects a bottom line impact of INR80 crores in FY26.: Kept

- Said: And we will see a bottom line impact of about INR80 crores.
- By: Navneet Kumar Saraf, Q1 FY25 earnings call
- Due: 2026-03-31
- Verdict: Kept
- Evidence: Net profit for FY26 came to ₹285 cr — past the ₹80 cr promised.

## 2024-08-20 · The company expects a revenue increase of INR450 crore in FY26.: Missed

- Said: And we will see in the next fiscal year, that is FY '26, we will see about INR450 crore increase in revenue
- By: Navneet Kumar Saraf, Q1 FY25 earnings call
- Due: 2026-03-31
- Verdict: Missed
- Evidence: Sales went from ₹2,596 cr in FY25 to ₹2,759 cr in FY26. That is up ₹163 cr, short of the ₹450 cr increase promised, with the window closed.