## Business model
A thermal power producer builds a large coal- or gas-fired plant, sources fuel (coal/gas) and water, generates electricity and sells it — usually to state distribution companies (discoms) under power purchase agreements (PPAs). It is one of the most heavily **government-regulated** businesses: the state controls approvals, land acquisition, fuel availability, tariffs, PPA/bidding rules, power scheduling and emission norms. Because supernormal power profits would raise the cost of everything in the economy, regulation deliberately caps returns — return on assets is structurally **lower than most other industries**. Thermal still dominates India's generation (~84% of energy supplied in FY22 from ~59% of installed capacity), so it remains systemically important and closely watched.

## First question: which model / segment?
The single most important distinction is **how the plant sells power and sources fuel** — it drives the entire risk profile. Establish these before anything else:

| | Lower risk end | Higher risk end |
|---|---|---|
| Tariff / PPA type | **Cost-plus (regulated) tariff** with fixed RoE and full cost pass-through (typical of central/state utilities) | **Competitive-bid tariff**; medium/short-term PPA; worst case **merchant / spot sales** (full volume + price risk) |
| Ownership | State-owned / central utility (sovereign backing, strong payment security, cost-plus PPAs) | Private independent power producer (IPP) sharing full market risk |
| Fuel | Coal with **captive mine** or firm domestic linkage (assured supply, competitive cost) | Imported coal (costly, policy-exposed) or **gas** (India lacks cheap domestic gas — many gas plants are unviable) |
| PPA tenor | Long-term PPA covering full loan tenor | Medium/short-term PPA (does not cover loan tenor; renewal at unremunerative tariff) |

Since Jan 2011 competitive bidding is mandatory for discom power purchase, and cost-plus PPAs have been ruled out for new private capacity — so newer merchant/bid-based IPPs sit firmly at the risky end.

## Key success factors
1. **Huge regulatory control over every stage.** Construction plans, land, forest/environment clearances, tariff changes, PPAs, fuel availability — all need government approval. Companies cannot raise prices freely. Governments have loosened the grip (private investment, some market pricing) but still influence every significant change. Because sector stress spreads to banks (large NPAs), the government periodically intervenes with relief (discom bailouts, coal linkage auctions, change-in-law relief).
2. **Capital-intensive → very high leverage.** Plants need huge upfront investment plus continuous maintenance/upgrade spend. Regulators explicitly allow a normative **debt-to-equity of 2.33 (70:30 debt:equity)**, so projects are structurally high-leverage — any adverse development quickly hits the financial position.
3. **PPA type is decisive — cost-plus RoE vs merchant risk.** A long-term **cost-plus PPA with full cost pass-through** (fixed RoE) is a big advantage over peers. Competitive-bid PPAs carry lower margins; medium/short-term PPAs don't cover the loan tenor (renewal risk); no PPA = spot/merchant sales with the highest volume and price risk.
4. **Fuel supply security & cost pass-through.** Thermal plants need vast amounts of coal/gas and water. Domestic coal shortages, changes in Indonesian mining rules, and restricted linkages have repeatedly turned PPAs unviable. **Captive coal mines / firm linkages** give assured supply at competitive cost and insulate from price swings. Cost pass-through of fuel is often litigated and delayed by discoms, so it cannot be assumed.
5. **Off-taker / discom counterparty strength & payment delays.** Discoms are the primary customers and most are financially weak with a track record of delayed payments. Once in a PPA it is very hard to exit (long tie-up, minimal chance to move out), so counterparty credit is critical. State-owned/central producers with sovereign backing and strong payment security are better placed.
6. **Cost efficiency drives dispatch (merit order).** Discoms must buy on **merit-order dispatch** — lowest variable-cost plants run first; high-cost plants sit idle. Proposed all-India market-based economic dispatch reinforces this. A low-cost producer can also sell to bulk/open market if a discom delays payment, reducing counterparty risk. Tariffs are inflexible while fuel costs are volatile, so cost efficiency is essential to stay profitable.
7. **Scale, diversification and integration.** Large producers get fuel/equipment economies of scale, better bargaining power with suppliers and regulators, and cheaper capital. Diversification across **customers (multiple off-takers), geography, and fuel/technology** stabilises operations. **Vertical integration** (mining → generation → transmission → distribution) strengthens the risk profile; S&P holds that unintegrated non-leaders struggle to reach investment grade.
8. **Construction & operational execution.** Land acquisition and clearances take the longest and risk delays/cost overruns; a signed PPA imposes penalties for missing the commissioning date. Plants can also sit idle if the **transmission line/grid connection** is not ready. EPC and O&M contracts with liquidated-damages clauses mitigate risk — but only if the contractor is creditworthy enough to pay damages.
9. **Entry barriers protect incumbents.** Large capital + long 3–4 year gestation + numerous approvals + socio-political hurdles deter new entrants. Incumbents enjoy existing PPAs, grid access and low-cost **amortized assets** (mature technology, minimal obsolescence, usable beyond statutory life). Government support to existing producers further muffles new competition.
10. **Threat from renewables (stranded-asset risk).** Renewable tariffs are now cheaper, RE gets "must-run" status and mandatory offtake, so thermal **PLF is under structural pressure** — coal plants face frequent back-down requests and shutdowns, especially in high-RE states. Rising RE competition (improving life/efficiency) is a long-term threat to thermal viability and asset value.
11. **Declining government support.** The policy direction is to shift market risk to private producers: from attractive cost-plus/take-or-pay PPAs to mandatory competitive bidding, benchmark-linked tariffs (fixed quote only for year 1 since Nov 2013), and refusal to guarantee cheap gas. No more assured high returns.
12. **Environmental & social risk.** Coal plants are leading polluters and huge water users; mining damages the environment. Tightening emission norms (e.g. FGD installation) demand continuous capex often with **no tariff-recovery mechanism**. Large land acquisition and unionised local labour add social risk (compensation disputes, local unrest, delays).

## Metrics — what we CAN compute from FinEdge/BigQuery data
| Metric | How | What "good" looks like |
|---|---|---|
| Operating margin (OPM) | existing views | Fuel (coal/gas) is a large cost — unlike renewables — so OPM is fuel- and efficiency-sensitive; watch trend and fuel-cost shocks |
| Leverage (D/E) | borrowings / (equity+reserves) | Structurally high (normative 2.33 allowed); but very high D/E + weak PPA/fuel = danger in a downturn |
| Interest coverage | (pbt+interest) / interest | Comfortable cover is essential given heavy project debt; thin cover = fragile |
| ROCE / ROE | existing views | Cost-plus (regulated) plants = stable, capped returns; merchant/bid plants = volatile. Structurally below other industries by design |
| Cash flow from operations (CFO) | cfo | Should be positive and stable; weak CFO signals dispatch/payment stress |
| Free cash flow (FCF) | cfo − capex (net_block/CWIP additions) | Heavy capex (build + emission upgrades) pressures FCF; persistent large negative FCF funded by debt is a warning |
| Receivable days | 365 × avg receivables / sales | Watch closely — rising days = discom/DISCOM payment delays (a defining sector risk) |
| Interest / debt trend | borrowings, interest over time | Rising leverage without matching PPA-backed cash flows is a red flag |
| Other income share | other_income / pbt | High reliance flags weak core generation profitability |

## Metrics we CANNOT get from financials (need annual reports / rating rationales — qualitative)
- **Plant Load Factor (PLF) and availability** — the core utilisation metric; falling PLF from RE back-downs is invisible in the P&L.
- **Tariff type & structure** — cost-plus (fixed RoE) vs competitive-bid vs merchant; fixed/variable charge split; escalation benchmarks.
- **PPA status & tenor** — long-term vs medium/short-term vs no PPA; whether it covers the full loan tenor; renewal exposure.
- **Fuel-supply status** — captive mine / domestic linkage / imported coal / gas; firmness of tie-up; fuel cost pass-through availability.
- **Off-taker (discom) credit quality** and **receivable ageing** — which discoms, their financial health, days of payment delay.
- **Installed capacity (MW)**, plant vintage, heat rate/variable cost competitiveness, merit-order position.
- **Emission-norm compliance status & pending capex** (FGD etc.) and whether recovery through tariff is allowed.
- **Diversification & integration** — number of off-takers, geographic/fuel/technology spread, presence across mining/transmission/distribution.
- **Construction/commissioning status, transmission-line readiness, EPC/O&M contractor creditworthiness, contingent liabilities and change-in-law claims.**

## Red flags
- **The classic stressed-thermal-asset pattern:** merchant / no-firm-PPA exposure **+** fuel-supply gaps (import dependence, no captive mine) **+** discom payment delays / rising receivable days **+** over-leverage (D/E well above the 2.33 norm with thin interest cover). Any two together are serious; all four is the textbook path to insolvency and bank NPAs.
- **Merchant / short-term PPA reliance** — full volume and price risk; medium/short PPAs that don't cover the loan tenor mean refinancing/renewal risk at unremunerative tariffs.
- **Fuel insecurity** — no captive coal / firm linkage, dependence on imported coal or (worst) domestic gas with no assured cheap supply; fuel cost pass-through stuck in litigation.
- **Weak or concentrated off-taker** — single financially-weak discom, long payment delays, and no ability to exit the PPA.
- **Stranded-asset risk from the renewables shift (emphasise)** — structurally falling PLF from RE must-run/back-downs, cheaper RE tariffs, tightening emission norms requiring uncompensated capex; the plant's economic life and asset value can erode well before its statutory life ends.
- High leverage with construction/execution delays, transmission bottlenecks, or a weak EPC/O&M contractor unable to pay liquidated damages.
- Returns propped by other income rather than core generation; contingent liabilities and unresolved change-in-law claims.

## One-line screen intent
A strong thermal power producer = a **large, low-cost, well-diversified** generator with a **long-term cost-plus (or firmly-contracted) PPA**, **secure fuel** (captive mine / firm linkage) with cost pass-through, a **financially strong off-taker** with clean payment history, **leverage and interest cover it can service through the cycle**, and **limited stranded-asset exposure to renewables** — most of which (PLF, tariff type, PPA tenor, fuel and off-taker status) must be verified from annual reports and rating rationales, not the financial statements alone.

## Audit addenda (2026-07-19)
- **Case-I vs Case-II bidding risk split**: projects where the developer must obtain land and all approvals itself (Case-I) are materially riskier than Case-II projects, where a government nodal agency arranges land and clearances — worth checking which regime an under-construction project sits in.
- **Named discom rescue schemes and their mechanics**: in the Sept 2012 scheme state governments took over 50% of discom short-term liabilities and the balance 50% was restructured with a 3-year moratorium under state guarantee; UDAY (2015) took 75% of discom debt onto state books. However, SERC-approved tariff revisions ran below UDAY MoU commitments, slowing discom loss reduction — bailouts recur, structural weakness persists.
- **Demand-supply arc behind merchant weakness**: India's peak power deficit collapsed from 12.7% in FY2010 to 0.7% in FY2020 as capacity addition outpaced demand — the backdrop for weak merchant tariffs and unsigned PPAs.
- **Coal policy timeline**: the Sept 2013 amendment to the coal distribution policy restricted domestic coal supplies mainly for plants commissioned after March 2009; GoI's June 2013 pass-through mechanism allowed imported coal to the extent of domestic shortfall, but implementation stayed uncertain amid discom opposition and litigation.
- **Named government support measures**: SHAKTI scheme for fresh coal-linkage auctions, aggregator-based medium-term procurement of power from plants without PPAs, and directions for time-bound disposal of change-in-law petitions.
- **Power-exchange traders as a second competitive threat (beyond renewables)**: new players buying from wholesale exchanges and supplying customers have intensified competition; in Japan this accelerated thermal plant shutdowns to the point of threatening supply stability.
- **Electricity Act 2003** is the specific trigger that de-licensed thermal generation and opened private entry (playbook mentions de-licensing but not the Act).
- **FGD/emission deadline history**: compliance was required by Dec 2017, extended to Dec 2022, then extended again by up to two years — deadlines slip repeatedly, but the end-state is comply or close the plant.
- **Regulatory inconsistency risk**: subjective interpretation and discretionary authority mean regulations are applied inconsistently; producers need flexibility to cope, and litigation with discoms over compensatory tariffs is the norm, not the exception.

## How the live EqScore scorer measures this sector (2026-09-16)

**Framework.** `standard` — the guide sets no `framework` key, so `score_company` runs it against
`STANDARD_DEFAULTS`. The standard card judges an operating business on margins, returns, cash,
leverage, working capital and size; there are no book-return or float checks, and the
promoter-pledge level applies (only banks and insurers are exempt).

**Shared mechanics.** Every numeric check is graded by `grade()`: full weight at the full band or
better, zero at the half band or worse, linear in between, hard clamp above full — and where a
config leaves `full == half` the check degenerates to a hard step. Verdicts (pass/half/fail) come
from the raw band comparison, so a graded fraction and its verdict are separate things. The score is
points earned ÷ points **attempted** × 100, rounded with Python's `round()` (half to **even**:
72.5 → 72). An `na` check leaves **both** sides of that ratio — a company is not punished for a
figure nobody published. `MIN_COVERAGE = 0.70`: below 70% of the checklist's weight no score is
published, only `insufficient_data`. No market value on record → no score. Below
`EXCELLENT_MCAP_FLOOR = 500` crore a score of `EXCELLENT_FLOOR = 80` or more is held down to 79.
Incomplete checklists are then blended one way only, toward the median of full-coverage peers
(`sorted(x)[n // 2]`, the upper middle), never upward. Unlike the solar and wind cards, this cohort
is large enough that the three-full-coverage-peer gate will normally be met, so the pull-down does
real work here. The filing overlay (fixed penalty table, decay by half-life, clamped to −20…+100)
and the promoter-pledge level sit on top of the financial core.

**Who is on this card, and a labelling problem worth naming.** The vendor label `Thermal Power`
holds **28** companies, and no alias maps any other label onto this slug. The genuine thermal and
integrated-utility names are here — NTPC, Tata Power, Adani Power, JSW Energy, Torrent Power, NLC
India, CESC, GIPCL, Jaiprakash Power, Nava, Reliance Power, RattanIndia Power, Vedanta Power,
DPSC, Energy Development. But the same label also carries companies that are plainly **not** thermal
generators: Waa Solar, Waaree Technologies, Insolation Energy, Ujaas Energy, Gita Renewable Energy,
IND Renewable Energy and K.P. Energy are solar or wind businesses, Globus Constructors & Developers
and Advance Metering Technology are not generators at all, and Emkay Taps and Cutting Tools is a
cutting-tools manufacturer. Every one of them is being judged on fuel-cost, asset-turnover and
₹5,000 cr size bands built for coal fleets. This is a vendor-taxonomy problem rather than a band
problem, but it materially affects who this card scores and how they rank. Flagged for review.
Separately, `VEDPOWER` sits on this card, though the retired solar playbook's scorer note named
"Ved Power" as a solar cohort reference; and Reliance Infrastructure and GMR Power & Urban Infra —
which that era's thermal note said would "move to Construction at the Sunday reload" — are indeed no
longer on this card.

**Sector-specific configuration.** `resolve_cfg` layers framework defaults ← sector `scoring`. The
guide declares **no `subsections` key at all**, so there is one set of bands and no `match` rule or
symbol pin exists to verify. This config sets margins, returns, graded debt and interest cover,
debtor days, raw-material share, size, the steadiness ceiling and cash conversion, and arms three
further checks: the margin-squeeze detector (`sqz_check: true`), net-fixed-asset turnover
(`nfa` 0.6/0.4) and `fcf_relief`. The total-outside-liabilities, wage-drift, growth and inventory
checks are off. Other income is left at the engine default. No weight overrides. Total points
attempted at full coverage: **125** — the widest checklist of the three power cards.

| Check label | Metric | Full credit | Zero credit at/beyond | Weight |
|---|---|---|---|---|
| Healthy profit margins | Avg operating margin, % | ≥ 25 | 18 | 20 |
| Steady margins | OPM std-dev ≤ 5pp and no collapse (last year < avg − 8pp) | boolean | — | 10 |
| Good return on capital | Avg ROCE, % | ≥ 12 | 7 | 15 |
| Generates real cash | 5y FCF sum > 0, with the `fcf_relief` half-credit | boolean | — | 10 |
| Low debt | Weaker of the D/E and interest-cover fractions | D/E ≤ 1.5, cover ≥ 2.0 | D/E ≥ 2.33, cover ≤ 1.3 | 10 |
| Gets paid on time | Debtor days | ≤ 75 | 150 | 10 |
| Doesn't just resell inputs | Raw-material cost % of sales | ≤ 60 | 72 | 10 |
| Profits come from the business | Other income % of PBT | ≤ 20 | 30 | 5 |
| No boom-and-bust | No collapsed revenue spike | boolean | — | 5 |
| Real cash behind profits | 5y CFO as % of 5y PAT | ≥ 150 | 100 | 10 |
| No margin squeeze | Consecutive years of RM share +1pp with OPM −0.5pp | 0 years; half credit at exactly 1 | — | 5 |
| Assets earn their keep | Net fixed-asset turnover, x | ≥ 0.6 | 0.4 | 10 |
| Meaningful size | Latest annual sales, Rs cr (log scale) | ≥ 5,000 | 1,000 | 5 |

**Bands that follow the guide.** This JSON carries **no `why` field at any level**, so no band states
its own rationale in the config. Where the retired playbook's scorer note gave a reason that still
matches the live numbers, it is attributed below; everything else is our reasoning and marked as
such.

- Returns at **12/7**, against the engine default of 15/10, are the regulated-return point this
  sector shares with the transmission card: the regulator caps what a rate base may earn, so a
  single-digit ROCE at a cost-plus plant is the model working rather than failing, while an
  efficient operator can still clear 12. The retired note stated exactly this reasoning, and it
  agrees with the live bands. See `utilities.md` for the same cost-plus mechanics on the pure
  regulated-transmission side; nothing here contradicts it — the difference is that this card also
  holds merchant and competitive-bid plants, for which price and dispatch genuinely are open
  questions.
- The steadiness ceiling at **5pp** is the tightest of these three power cards (solar and wind sit at
  15pp) and only 1pp above the engine default. The retired note's stated reason was that
  merchant-cycle margin swings should fail it, so cycle luck cannot top the sector — consistent with
  the live value.
- **Asset turnover armed at 0.6/0.4** is the one check unique to this card among the three, and the
  retired note stated its purpose plainly: a **plant-load-factor proxy**, so stranded capacity fails
  where a working fleet passes. That rationale matches the live config. Note the engine's
  **commissioning grace**: if the normal graded fraction would fall below 0.5, a plant in its first
  year (CWIP ≥ 10% of net block, or net block up ≥ 20% YoY) takes half credit, and in a second year
  only if revenue also grew ≥ 15%. The grace is a floor, never a cap — a genuinely ramping new plant
  is not scored as stranded.
- Debtor days at **75/150**, the strictest of the three cards, are the honest measure of the guide's
  defining cash risk: discom payment delay. The retired note said the band was kept deliberately for
  that reason, and the live values match. This is the same counterparty risk `utilities.md` treats as
  the sector's real credit question.
- **`sqz_check` armed** is coherent here in a way it is not on the other two cards: this is the only
  one of the three whose plants buy fuel, and the check is precisely a detector for consecutive years
  of rising input share against falling margin — i.e. fuel cost pass-through failing, which the guide
  names as routinely litigated and delayed. (Reasoning; the retired note did not mention this check.)
- Raw material at **60/72**, looser than the engine's 45/55, brackets a business where fuel is a
  large and legitimate cost rather than evidence of reselling. (Reasoning.)
- Size at **5,000/1,000**, by far the largest bars of the three cards, follows the guide's scale
  argument — fuel and equipment economies, bargaining power with suppliers and regulators, cheaper
  capital. It also means most of the small and mislabelled companies noted above fail size outright.
  (Reasoning.)

**Leverage: the band matches the norm, and that is the problem.** `de_half` is **2.33** — exactly the
normative debt-to-equity the guide names in key success factor 2 (70:30). Because zero credit falls
at `de >= de_half`, a plant financed *precisely as the regulator contemplates* earns **nothing** on
the D/E leg of "Low debt", and since the check takes the **weaker** of the D/E and interest-cover
fractions, a strong cover cannot rescue it. Full credit requires D/E ≤ 1.5, which is well inside the
regulatory norm. The JSON gives no stated reason for placing the zero bar on the norm itself rather
than above it. This is the same tension `utilities.md` flagged for the regulated four, and it is
recorded here for the same reason rather than explained away.

**The FCF relief, exactly as the engine implements it.** `fcf_relief: true` gives **half** credit
instead of a fail on negative five-year FCF, but only when interest cover ≥ 1.5x **and** D/E is
between 0 and 2.0 — both hardcoded in `score_company`, neither sector-tunable (the `0 <=` leg exists
because negative net worth makes D/E negative, and "−5.0 ≤ 2.0" would otherwise pass). The retired
note described this as letting a rate-base builder take half while a stressed build-out with cover
under 1 still fails outright, which is what the code does. Note the interaction with the leverage
bands above: the relief's D/E ≤ 2.0 condition is stricter than this card's own 2.33 zero bar, so a
plant at the regulatory norm is both failing leverage and ineligible for the relief.

**The one band that is purely an engine default.** Other income at **20/30** is `STANDARD_DEFAULTS`,
not a judgement about thermal power, and is marked as such rather than presented as sector
calibration. (Wind's other-income band is the same default; solar's is the one of the three that
overrides it, at 30/60.)

**Segment signal.** From `seg_hi`/`seg_mid` against average OPM: ≥ 25% "Strong pricing power",
≥ 18% "Moderate pricing power", otherwise "Low pricing power". These are the engine's **default**
labels — the guide does not override them — and for the cost-plus end of this sector they are the
wrong words: a regulated plant's margin is a tariff order's arithmetic, not power over price. The
label is more defensible for the merchant and competitive-bid plants on this card, where price
genuinely floats. The regulated-utilities card replaces these labels outright; this one does not.

**Version.** `method_version` is `"m" + SCORER_REV + "." + sha256(payload)[:8]` — currently
`m2.<8 hex>` (`SCORER_REV = "2"`). The payload covers the penalty and half-life tables, every
framework's defaults, **every sector's `scoring` block and subsection overrides**, the aliases, the
coverage and top-tier gates, the pledge ramp and the overlay clamp — so editing any band above
changes the published method version.

# EqScore checks

The checks eqdoc scores a company in this sector on (its [EqScore](https://eqdoc.com/guide/thermal-power)), in the order of the card.

| Factor | The question | Good | Red flag |
|---|---|---|---|
| PPA / tariff type | Does the plant sell under a long-term cost-plus (fixed RoE) PPA rather than competitive-bid, short-term or merchant sales? | long-term cost-plus PPA with full cost pass-through | merchant/spot or medium-short PPA not covering loan tenor = full volume & price risk |
| Fuel supply security | Is fuel (coal/gas) assured via captive mine or firm linkage, with cost pass-through, rather than costly imports? | captive mine / firm domestic linkage at competitive cost | import-dependent or gas plant with no assured cheap supply; pass-through stuck in litigation |
| Fuel cost intensity | Is operating margin resilient given fuel is a large cost (unlike renewables)? | stable OPM through fuel-cost cycles | OPM collapsing on fuel-cost spikes with no tariff pass-through |
| Leverage / capital intensity | Is debt-to-equity within a serviceable range (normative 2.33 allowed) not dangerously above it? | at/below the 2.33 norm and serviceable | very high D/E on a merchant/weak-PPA asset = quick stress |
| Debt serviceability | Does operating profit comfortably cover interest on the heavy project debt? | comfortable, stable coverage | thin cover = fragile to any dispatch or payment shock |
| Returns quality | Are ROCE/ROE stable (regulated cost-plus) rather than volatile merchant returns? | stable through-cycle returns (capped by regulation) | volatile/eroding returns; structurally below other industries by design |
| Off-taker payment / receivables | Are receivable days stable, i.e. discoms paying on time? | stable receivable days | rising days = financially-weak discom delaying payments (defining sector risk) |
| Off-taker credit quality | Is the off-taker (discom) financially strong / sovereign-backed, and are off-takers diversified? | strong or multiple off-takers with clean payment record | single weak discom, long payment delays, no ability to exit the PPA |
| Cash generation & capex | Is CFO positive and FCF not persistently deep-negative from build/emission capex funded by debt? | positive CFO; FCF not chronically debt-funded | weak CFO + large negative FCF funded by rising borrowings |
| Utilisation (PLF) & availability | Is PLF/availability healthy and not structurally falling from RE back-downs? | high, stable PLF and merit-order competitiveness | falling PLF from renewable must-run back-downs and shutdowns |
| Stranded-asset / renewables risk | Is the plant insulated from cheaper renewables and tightening emission norms (FGD capex)? | low-cost, compliant, integrated/diversified asset | stranded-asset risk: cheaper RE + uncompensated emission capex eroding economic life |
| Scale, diversification & integration | Is the producer large, cost-efficient and diversified across fuel/geography/customers with vertical integration? | large low-cost, diversified, integrated (mining to distribution) | small, single-fuel, single-region, unintegrated player with weak bargaining power |
| Project execution & power evacuation | For under-construction capacity, is land/clearance risk low (Case-II style, government nodal agency) and is the transmission line ready so the plant is not idle at commissioning; is the EPC/O&M contractor creditworthy enough to actually pay liquidated damages? | Case-II style approvals, evacuation infrastructure tied up, creditworthy fixed-price EPC/O&M with liquidated-damages clauses | developer-led land acquisition stuck, plant ready but transmission line not, weak EPC contractor unable to pay damages, PPA penalties for missed commissioning date |
| Merit-order cost position | Is the variable cost of generation low enough to be dispatched high in the merit order and to sell profitably to bulk/open-market buyers if the discom delays payment? | low variable cost, high merit-order rank, open-market sale optionality reducing counterparty risk | high-cost plant sits idle under merit-order (and proposed all-India market-based) dispatch despite full capex and debt on the books |
| Environmental & social licence | Are land compensation, water sourcing tie-ups, local pollution impact and unionised labour managed without disputes that stall operations or expansion? | settled land and water arrangements, compliant emissions, no local unrest or labour disruption | compensation disputes, water-depletion opposition, pollution-driven local unrest or union action delaying the project or operations |